Mining Substation & Paralleling Skid — 1.25 to 2.5 MVA

Mining Substation & Paralleling Skid — 1.25 to 2.5 MVA

Categories:

1.25–2.5 MVA transformer, MV switchgear and paralleling on one ISO skid, for six to forty containers.

1.25–2.5MVA
10 / 35 kVMV side
6–40containers
ISOskid frame
01 / OVERVIEW

What it is for

Every farm reaches the same wall: the containers arrive faster than the transformer. A substation skid ordered with the first container is what keeps a site on schedule.

We build the transformer, the MV switchgear and the LV distribution on one ISO skid, wired and tested, so the site work is a cable trench and a fence rather than a switchgear room.

Where it is typically used

Farm buildsOne skid per six to twelve containers, paralleled as the farm grows.
Rented landSkid-mounted means it can be lifted and moved with the containers.
Weak gridsTap changer and power factor correction to hold the feed steady.
Staged sitesAdd a second skid without touching the first.
02 / SPECIFICATIONS

Key specifications

Rating 1.25 or 2.5 MVA, ONAN
MV 10 or 35 kV, ring main unit, 3 or 4 way
LV 400/415 V, 4–8 outgoing feeders
Protection Overcurrent, earth fault, Buchholz, temperature
Parallel Up to 4 skids on one bus with load sharing
Skid ISO corner castings, lifting lugs, bunded floor
Footprint 6,058 × 2,438 mm, 20 ft envelope
Build time 45–60 days, transformer lead time excluded

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Transformer

Oil-immersed ONAN unit with tap changer and temperature protection.

02MV switchgear

Ring main unit with earthing switch and interlocks.

03LV panel

Outgoing feeders to each container, metered per feeder.

04Skid

Bunded steel frame with ISO castings, liftable by reach stacker.

05Protection

Relays, CTs and a test terminal block a third party can verify.

04 / MODELS

Which model to take

Model Rating MV Feeders Containers
MC-SUB-12 1.25 MVA 10 kV 4 6–8
MC-SUB-25 2.5 MVA 10 kV 8 12–16
MC-SUB-25H 2.5 MVA 35 kV 8 12–16

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

Order the transformer first, the containers second

ENGINEERING NOTE

MV equipment is the long pole

A container is 30–45 days. A 2.5 MVA transformer with a ring main unit has run 30–50 weeks on some routes. If the two are ordered together, the site waits for the transformer either way — so order it first and let the containers catch up.

The one thing not to do is size the skid for the first stage. A 1.25 MVA unit bought for six boxes will not carry twelve, and a second skid costs more than the difference.

Transformer lead time is quoted separately and confirmed at order; we will not hold a delivery date we do not have.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

You are building six containers or more.

The skid is cheaper than a switchgear room and arrives assembled.

The site is rented or temporary.

Everything lifts out with the containers.

You have 400 V available at the fence.

Then you need LV distribution, not a substation.

Your utility requires a masonry building.

Some do. We will still supply the switchgear, but not the walls.

07 / DELIVERY

From contract to energisation

Data

MV voltage, fault level, container count, utility requirements.

Drawing

Single-line diagram and protection schedule in 7 days.

Production

45–60 days after the transformer lands.

Site

Two days to set and terminate, one day to commission.

08 / GALLERY

On site and in detail

A substation skid outdoors
A substation skid outdoors
LV panel with metered feeders
LV panel with metered feeders
Skid loaded for export
Skid loaded for export
Skid position on a farm layout
Skid position on a farm layout

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Can you supply the transformer locally?

We can specify it and you buy locally to avoid freight and duty. The skid is built around a known envelope.

What fault level do you design for?

25 kA for three seconds as standard, higher on request.

Is the skid certified?

The frame is built to ISO 1496 lifting practice; the electrical assembly is tested to IEC 61439.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the mining range

Product Details
gallery
RELATED PRODUCT
An immersion-cooled mining container with tanks of dielectric fluid
40HC Immersion Mining Container — Up to 1.4 MW in Dielectric Fluid
A 20-foot water-cooled mining container on a paved site
20GP Water-Cooled Mining Container — 96 Hydro Units at 0.55 MW
Water-cooled mining containers in a row along a street
Water-Cooled Mining Farm — 2 to 10 MW with a Shared Heat Rejection Loop
20 ft mining container with doors open (catalogue crop)
40HC Air-Cooled Mining Container — 336 Machines at 180 kW
Contact us

Committed to providing customers with high-quality and reliable container solutions.