A two-storey container house in dark charcoal with a glazed corner and an external steel stair

Product line · Container houses · 12 products · 20 ft to 40 ft

Twelve container buildings — from a gate cabin to a two-storey camp.

Every unit on this page is the same construction: a galvanised steel frame, insulated sandwich panels, a welded floor deck and a corner casting at each end so it lifts, ships and stacks like a container. What changes is the length, how many rooms it holds, whether it stacks, and what is inside the walls.

12products in the range
5.8 m²smallest, the guard cabin
120 m²largest, the pavilion
2 per 40HQ20 ft units, flat packed
Galvanised frame2.5–3.0 mm posts
5 systemsUS · EU · UK · AU · JP
50–100 mminsulation grades
Knock-downor lifted in one piece
The product range · 12 units in three tiers

Twelve buildings, three tiers — and every card is a product page.

Every card below is a product with its own page: the drawing, the loading plan, the fit-out options and the price logic. Tier 01 is the five standard units by use, tier 02 changes the structure — two storeys, a glazed corner, a row — and tier 03 is the building around the site: the pavilion you sell from, the welfare block, the gate and the ablutions.

What you are actually buying

A frame, a panel and a container slot — in that order

A container building is bought on three numbers: the floor area, the number of units that fit in a 40HQ, and how many people one door serves. Everything else — the colour, the fit-out, the signage — sits on top of those three and is easy to change. The three are not.

That is why the range is built on fixed shells and fixed fit-out kits rather than a custom cut. A new shell changes the tooling, the panel set, the loading plan and the spare-parts list at the same time, and it usually costs more than the extra floor area is worth. Inside that system almost everything is a choice: how many berths, whether there is a bathroom pod, which climate grade, which electrical system, whether the unit stacks.

The twelve products below are the configurations we build often enough to have their own drawing. Anything that is not on this page — a different partition layout, a specific counter run, a two-storey with a lift — starts as a conversation and becomes a drawing, which is the same way every unit here started.

01 / THE SHELL

A galvanised frame under an insulated panel — the same shell for a gate cabin and a hotel

The structure is a welded galvanised steel base frame with corner castings, corner posts and a top rail, clad in sandwich panels with a PU or mineral wool core. The panel is structural in the walls that are solid, which is why glazing a second elevation changes the frame rather than just the window.

The shell is modular in one direction: length. Width and height are fixed, so the castings, the door frame, the window frames and the roof edge are common parts across every unit on this page — including the guard cabin and the pavilion modules. One spare-parts box covers a whole camp.

The finish is the part that ages on a site. Panels are coil-coated before forming, cut edges are sealed at the joint, and the base is closed with a skirt rather than left open — which is the difference between a unit that looks new in year five and one with rust blooming from the floor line.

A two-storey container building with charcoal panels, glazing and a steel stair
02 / THE FIT-OUT

The pod, the service wall and the counter — where a container becomes a building

A bathroom built on site in a container is the single most common source of warranty claims we see, because the shell flexes and a site-built tray cracks at the seal. Every wet module we build uses a moulded pod, dropped in before the roof goes on, plumbed to one waste and one supply.

The service wall is the second decision. Putting every pipe, duct and cable in one accessible wall means the whole building is commissioned from one point, extended from one point and repaired without opening a room. It costs about 4% of the fit-out and it saves a trench per module.

The third is the counter. In a café, a guard cabin or a site office, the counter height and the sill height decide whether the building works: a serving hatch at the wrong height is a queue, and a guard cabin with the sill at 900 mm is a fishbowl.

A guard cabin with a counter-height sill and a three-sided glazed front
Side by side

Twelve units, and what each one is actually for.

Floor area, configuration, whether sanitary is included, and how many units a container carries. The five standard units are priced below; the seven structural and site products are quoted against a drawing, because what they contain changes the number more than the shell does.

Model Floor area Configuration Sanitary Per 40HQ Min. order From USD
HSE-OFF Office unit 13.9 m² / 149 ft² Open plan, 2–6 desks Optional pod 2 units 3 units 5,980
HSE-ACC Accommodation 13.9 m² / 149 ft² 4 berths, 2 bunk pairs Shared block 2 units 3 units 5,450
HSE-CAF Café & retail 13.9 m² / 149 ft² Hatch, counter, store Wash basin 2 units 1 unit 6,850
HSE-HTL Hotel suite 27.9 m² / 300 ft² 2 keys, en-suite each 2 pods 1 unit 1 unit 13,900
HSE-40C 40 ft combination 27.9 m² / 300 ft² 2 rooms, one door Optional pod 1 unit 1 unit 11,600
HSE-2ST Two-storey house 27.9 m² per floor Stacked, braced, external stair As specified 2 units 1 block On request
HSE-GLC Glass corner 13.9–27.9 m² Two elevations glazed As specified 2 (20 ft) 1 unit On request
HSE-ROW Motel row 13.9 m² per key Doors on the long side, walkway En-suite or block 4 units 6 keys On request
HSE-SHW Showroom pavilion 80–160 m² 8 modules + glazed hall Pod + kitchenette 4 × 40HQ 1 project On request
HSE-STE Site office & welfare 4–8 modules · 56–111 m² Office, canteen, drying, lockers WC + shower modules 2 modules 4 modules On request
HSE-GRD Guard house 5.8–7.2 m² 1 booth, counter, 3-side glazing None 1 unit 1 unit On request
HSE-WC Toilet & shower 13.9–27.9 m² 6 or 12 cubicles All 2 units 1 unit On request

Prices are the fitted shell, EXW China, before freight, duties and on-site work. Air conditioning, the bathroom pod where it is optional, hot water plant, the canopy and the treatment tank are quoted per order. Structural and site products are priced against a drawing because the fit-out moves the number more than the shell does.

How it is built

Six decisions, then a unit leaves the yard

01
Unit and layoutOne of the standard shells, then the partition, pod and counter positions for that shell. The layout is drawn, not improvised.
02
Electrical systemUS, EU, UK, AU or JP, fixed at order with the socket layout drawn per unit, and a separate board per module in a block.
03
Insulation and glazingOne of three wall grades from 50 mm to 100 mm, with the glazing matched to it. The top unit of a stack always takes the heavier roof.
04
Factory fit-outBathroom pods, service wall, counter runs and FRP wet walls are fitted before the roof panel goes on, so the waterproofing is a factory joint.
05
TestEvery opening water-tested, every circuit tested and tagged, every wet module flood-tested — the test sheet travels with the shipping documents.
06
PackingFlat pack in assembly sequence, or one piece on a flat rack. Loading plan issued with the packing list so the container is loaded in the order the site unpacks it.
How the number is made

A container building is priced by the fit-out, the insulation and the container

Two units of the same length can differ by half, because one has a pod, a service wall and a 100 mm wall, and the other is an empty shell. Send these five answers and the number is real.

01

What we need from you

  • Unit type and quantity, and whether they ship flat pack or assembled
  • Headcount or key count, and the shift pattern
  • The coldest and hottest month on site, and whether the unit runs all year
  • Electrical system: US, EU, UK, AU or JP, and whether there is water and waste on site
  • Ground: slab, screw piles or a prepared hardstanding — and whether there is a crane
02

How long to a number

  • 48 hours for a first-pass price with a block plan and a loading plan
  • Specification frozen, then the price is held for 10 calendar days
  • Any change after the freeze is re-quoted, not absorbed
03

How long to a unit

  • 20–25 days for a standard unit, counted from deposit and drawing approval
  • 30 days for a stacked or glazed unit, and for a fitted welfare block
  • 45 days for a pavilion, including the hall frame and the facade

Quotation terms: quoted per unit against a released drawing. Not valid as a public price list. Freight, duties, foundation, crane, on-site assembly and local fit-out are excluded unless listed.

Questions we get

Straight answers

How many units fit in one 40HQ?Two 20 ft units flat packed, or one 40 ft. That ratio is the main commercial difference between the lengths: freight per square metre falls sharply on the 40 ft, and freight per berth or per key falls on the 20 ft.
Can they be stacked?Two high as standard, three with the heavy-duty frame and a crane. The lower unit carries about nine tonnes in a three-high stack, which is why the posts go from 2.5 mm to 3.0 mm and the bracing kit is not optional.
Do I need a foundation?Four level bearing points per unit: castings on a slab, or screw piles with an adjustable head. The ground has to be level within 10 mm across the footprint, otherwise the door binds and the panels do not close.
Is a bathroom included?Only if you order the pod. The shell has no sanitary provision, and a site-built bathroom in a container is the most common source of warranty claims we see. A pod costs about 1.5–1.6 m² of floor area.
What is the difference between this range and the expandable houses?These are fixed shells: what you see is the floor area. The expandable range opens out to roughly twice the floor in the same shipping footprint, which is better for living space and worse for lead time and cost per square metre.
Can you build a layout that is not on this page?Almost always, because the shell is fixed and the fit-out is not. A different partition, a counter run, a two-storey with a canopy or a block with eight modules instead of six is a drawing change rather than a new product. A new shell is a different conversation.

Send a site plan. Get a block plan back in two days.

Country, ground conditions, headcount and what the building has to do. That is enough to start — no drawings, no commitment.

Send the site plan container-nan@anchengtong.com · +86 177 2798 0755