40HC Air-Cooled Mining Container — 336 Machines at 180 kW

40HC Air-Cooled Mining Container — 336 Machines at 180 kW

Categories:

336 machines at 180 kW in a 40 ft box, sixteen negative-pressure fans, one breaker per machine position.

336machines
180 kWdesign load
16fans
28PDU strips
01 / OVERVIEW

What it is for

This is the box the market actually buys. A certified 40HC shell, two power cabinets, sixteen negative-pressure fans, and a cold aisle wide enough that a technician can pull a machine without dismantling its neighbour.

It is rated at 180 kW because that is where air still works: above that the fans stop earning their keep and the exhaust temperature climbs faster than the airflow does. If you need more per box, water cooling is the next step, not a bigger fan.

Where it is typically used

Standard mining hallsRows of identical boxes on a gravel pad, fed from one substation.
Rented spaceLift in, connect, mine, lift out. Nothing is built in.
Cold and temperate sitesWhere the inlet air does the cooling for eight months of the year.
Mixed fleetsOne breaker per position, so an S19 row and an S21 row can share a box.
02 / SPECIFICATIONS

Key specifications

Shell 40HC, CSC plated, 12,192 × 2,438 × 2,896 mm
Machines 336 at 5.7 kW class, 4 columns × 84
Design load 180 kW at 35 °C ambient
Power 2 cabinets, 1,200 A main, 1 breaker per position
PDU 28 strips, 12 × C19 + 1 × C13, switchable per socket
Airflow 16 × 1,220 mm negative-pressure fans, 0.75 kW each
Inlet 100 mm aluminium water curtain + 40-mesh filter
Network 16 × 24-port switches + 1 aggregation, labelled and tested
Weight About 24 t loaded, 4 corner castings for lifting
Build time 30–45 days from drawing release

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Certified shell

CSC plate, 50 mm insulated roof, service and escape doors at both ends.

02Power cabinets

Main breaker, branch protection per position, UL/CSA or IEC cable to destination.

03PDU strips

Switchable per socket, mounted at standing height rather than at floor level.

04Air path

Negative-pressure fans, curtain or snow baffle, cold and hot aisle separation panels.

05Network and spares

Switches, one cable per machine, plus belts, a fan motor and a PDU strip in the box.

04 / MODELS

Which model to take

Model Machines Load Inlet Ambient
MC-AIR-40-S 336 180 kW Water curtain 35 °C
MC-AIR-40-H 336 180 kW Curtain + pre-cool 42 °C
MC-AIR-40-C 300 165 kW Snow baffle −25 °C

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

Why the fans pull instead of push

ENGINEERING NOTE

Negative pressure puts the dust where you can reach it

A pressurised box leaks hot air out of every seam, and the dust comes in wherever the pressure is lowest — usually around the cable entries, on top of the boards. A negative-pressure box pulls air through one filtered inlet, so what you clean is a curtain and a mesh panel, not 336 heat sinks.

The cost is fan power and about 100 mm of usable width. At 180 kW that trade is worth taking; at 1.2 MW the fans cannot move enough air at all, which is why the water-cooled box exists.

Inlet filtration is a maintenance item, not a filter you fit once. We specify the wash interval with the ambient and the dust load at handover.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

You run 300–350 machines per box and the ambient stays under 40 °C.

This is the configuration the design was drawn around.

You want a box you can resell or move.

Nothing is cast in; the shell retains its CSC plate and its resale value.

You are above 200 kW per box.

The fans will not keep up and the machines will throttle. Take the water-cooled 40HC.

The site is dusty and nobody will wash filters.

A dirty inlet turns 180 kW into 140 kW within a season. Be honest about the maintenance.

07 / DELIVERY

From contract to energisation

Drawing

Machine model, wattage, ambient, voltage and inlet choice. Five days to a drawing.

Production

30–45 days, with the electrical build photographed stage by stage.

Test

Four hours at rated load on a resistive bank, ambient logged.

Ship

One 40HC per box, loaded with the spares kit and the test sheet inside.

08 / GALLERY

On site and in detail

40 ft mining container shell in the yard before dispatch
40 ft mining container shell in the yard before dispatch
Machine rows and cold aisle
Machine rows and cold aisle
Fan bank and inlet filtration on the side wall
Fan bank and inlet filtration on the side wall
Distribution cabinet, one breaker per position
Distribution cabinet, one breaker per position

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Is 336 machines an S19 or an S21 count?

Both fit if the wattage per position matches. The count is set by the power, not by the model name — send the model and we size to it.

Can the water curtain be deleted?

Yes. A snow baffle replaces it in cold climates, or an air hood in dusty ones. Both change the airflow calculation, so they are options rather than deletions.

How loud is it?

68–72 dB(A) at ten metres. Plan the fence line and the prevailing wind before the layout.

What is in the spares kit?

One fan motor, thirty belts, one PDU strip, a set of sockets, a motor protection relay and breakers.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the mining range

Product Details

336 machines, and a breaker for each one

Two electrical cabinets, a 1,200 A main moulded-case breaker and branch protection per position —
14 × 80 A plus one 63 A on the standard arrangement. Twenty-eight PDU strips, twelve C19 sockets and
one C13 each, switchable per socket. When one machine starts pulling 300 W more than its neighbours you
isolate it from a browser, not from a busbar.

Built for the summer you actually have

Sixteen 1,220 mm negative-pressure fans with UL/CSA-certified 0.75 kW motors pull air through the inlet
instead of pushing it out of every gap, so dust lands on the filter rather than on the boards. A 100 mm
aluminium water curtain plus 21 mm 40-mesh filtration sits behind them. On a humid site the curtain is
also an evaporative cooler; in a cold climate we fit a snow baffle instead, because a frozen curtain is a
warranty claim.

Key figures

  • 336 machines · 180 kW safe operating load · 40HC shell
  • 2 electrical cabinets · 1,200 A main MCCB · 14 × 80 A + 1 × 63 A branch
  • 28 PDU strips · switchable per socket · UL-listed 4 AWG copper
  • 16 × 1,220 mm negative-pressure fans · UL/CSA 0.75 kW motors
  • 100 mm water curtain + 21 mm 40-mesh inlet filtration
  • 16 × 24-port switches + 1 aggregation switch, labelled and tested

Built to order. Machine count moves with the wattage per position you run, and the
electrical standard is set by the destination country.

gallery
RELATED PRODUCT
Electrical distribution cabinet inside a mining container
Mining PDU & Monitoring — Per-Position Metering and Remote Power Cycling
An immersion-cooled mining container with tanks of dielectric fluid
40HC Immersion Mining Container — Up to 1.4 MW in Dielectric Fluid
Water-cooled mining containers in a row along a street
Water-Cooled Mining Farm — 2 to 10 MW with a Shared Heat Rejection Loop
A 20-foot air-cooled mining container outdoors
20GP Air-Cooled Mining Container — 144 Machines at 66 kW
Contact us

Committed to providing customers with high-quality and reliable container solutions.