What it is for
When one machine starts drawing 300 W more than its neighbours, you want to isolate it from a browser, not from a busbar. That is the whole value of a metered, switchable PDU — and it is the part most containers skimp on.
We supply the strips, the cabinet, the metering and the dashboard as one item, wired per position and labelled to match the machine map.
Where it is typically used
Key specifications
| Positions | 8, 16, 24 or 32 per cabinet |
| Sockets | C19 and C13 mix, or L6-30R for US builds |
| Metering | Per socket, ±1% class |
| Switching | Per socket, relay or solid state |
| Protocol | SNMP v3, Modbus TCP, REST |
| Input | 3-phase, 400/415 V, up to 800 A |
| Mounting | 19-inch, 1 U per strip, front accessible |
| Build time | 15–20 days |
Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.
What goes in the box
Installed, wired and tested before dispatch. On site the work is placement and external connections.
1 U strips with per-socket metering, mounted at standing height.
Steel enclosure with a lock, a fan and a DIN rail for the gateway.
One controller per cabinet, SNMP and Modbus, local web page.
UL-listed copper to the strips, terminated and tested.
Position map printed and matched to the switch ports.
Which model to take
| Model | Positions | Sockets | Switching | Input |
|---|---|---|---|---|
| MC-PDU-08 | 8 | C19 | Relay | 3 × 63 A |
| MC-PDU-16 | 16 | C19 / C13 | Relay | 3 × 125 A |
| MC-PDU-28 | 28 | C19 + C13 | Relay | 3 × 250 A |
Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.
Per-socket metering pays for itself in one bad batch of PSUs
You cannot fix what you cannot see
A container with one meter on the main breaker tells you the total and nothing else. When a row starts tripping, the difference between a failing PSU, a bad cable and a hot spot is visible only per position.
Metered strips cost a few percent of the box and they are the difference between a two-hour fix and a two-day one.
When to use it, when not to
These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.
Remote cycling is the main reason to buy it.
Measured billing removes the argument.
The dashboard is overkill; a breaker is enough.
Buy the metering but skip the gateway.
From contract to energisation
Position count, socket type, voltage, protocol.
15–20 days including test.
Every socket cycled and metered before dispatch.
Label sheet, CSV map and the gateway config file.
On site and in detail




Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.
What customers ask most
Can it retrofit into our existing boxes?
Yes, if the cabinet has space and the cable schedule is known. We supply the strips and the gateway separately.
Does it work without internet?
Yes. The gateway runs a local page and buffers data; the cloud link is optional.
What is the switching life?
100,000 operations for the relay type, which is well beyond a five-year service life.
Ask for a scheme for your site
Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.



