A row of white equipment containers standing outdoors on a concrete pad at dusk

Equipment enclosures · 11 products · 10 ft, 20 ft, 40 ft

The machine is yours. The room around it is the part that fails inspection.

Every box on this page exists for one reason: something expensive has to sit outside, in the weather, and stay inside its temperature, its fire rating and its ingress class. We do not make the battery, the switchgear or the genset. We make the room that keeps them in spec — and we build it to the drawing your equipment supplier already gave you.

11products in the range
C4corrosion as standard
IP54ingress, IP65 on request
35 daystypical build
RAL 9006standard finish, three coats
−40 / +55 °Cdesign ambient range
EU / NFPAfire options
1 unitis a valid order
The product range · 11 products in three tiers

Eleven products, three tiers — and every card is a product page.

Every card below is a product with its own page: the specification, the delivery boundary, the options and the price logic. Tier 01 is a complete equipment room with the thermal and fire systems designed in, tier 02 is a room for one specific job, tier 03 is the envelope, the base and the air side that you can buy on their own.

What we actually control

Six interfaces, and every one of them is somebody else’s fault until it is written down

An equipment enclosure is a contract about boundaries. Your supplier warrants the battery, the inverter or the switchgear; we warrant the room. The failures happen at the boundary — the cable entry that was not on anybody’s drawing, the heat load that came from a nameplate instead of a datasheet, the fire suppression nobody sized because the box was “just a container”.

So we start from the interfaces: thermal (how many kW have to leave, at what ambient), fire (what the equipment and the insurer require), corrosion (what the site air does to steel in ten years), access (how a technician reaches the part that fails), lifting and transport (whether it travels as freight), and penetrations (cable, pipe, duct, and how many spare ways you want).

Each of those is a line on a drawing with a number beside it. When we quote, you get that drawing. If a number is missing, we ask rather than assume — because the assumption will be wrong in the direction that costs you a refit.

01 / THERMAL

5 kW of cooling in a 10-foot box — and it is the first number that gets undersized

Our standard 10 ft BESS enclosure carries a 5 kW unit, four fixed louvres in the door and six dual fans. That is enough for the battery racks it was designed around, and not enough if you change the racks.

The trap is quoting cooling from the equipment nameplate. A battery rack dissipates a fraction of its rated power as heat, but the fraction depends on C-rate, chemistry and the inverter’s efficiency curve. We size from your actual loss figure, and we write the design ambient on the drawing next to it.

Insulation matters as much as the A/C. Polyurethane fill in the walls and roof, a thermal break at the frame, and a roof coating that stops the box becoming a solar collector. In a 10 ft box there is no volume to buffer a bad decision.

Battery storage containers installed on a concrete pad at a site
02 / FIRE

Detection you can test, and suppression you can weigh

Fire protection is where equipment containers get cheap and then get expensive. A lithium battery fire is not a diesel fire and it is not a paper fire; the agent, the detection logic and the ventilation strategy all change with the chemistry.

We build to the standard your insurer or your market requires — European-standard kits for BESS going into the EU, NFPA-style arrangements for North America, and clean-agent systems for electronics rooms. Cylinders go where they can be weighed and replaced without dismantling the room, and the detection loop is testable from outside.

For a hazardous waste store the requirement is different again: bunded floor, forced ventilation, explosion-relief panels where the classification demands it, and signage that survives a site inspection. That is an environmental approval item, not a nice-to-have.

A hazardous waste store container with hazard signage and a lifting frame
03 / CORROSION

Three coats of epoxy in C4, because a box in a coastal yard is a fifteen-year decision

Our standard finish is RAL 9006 in a three-coat epoxy system to C4 — suitable for industrial and coastal sites with moderate salt exposure. For a quayside or an offshore yard we go to C5-M and change the fixings to stainless.

The details decide it: galvanised frame, drainage that does not run down a door seal, no bare steel where a hinge was welded, and a floor that will not rust through under a leaking battery rack. A container painted inside and out but left with raw edges at every cut-out will fail from the cut-outs.

We tell you which class we are building to, and we do not sell C5 at C4 prices. If your site is 200 m from the sea, say so — the cost difference is small next to replacing a box in year six.

A row of white equipment containers installed outdoors
04 / INTERFACES

The cable entry is where the project schedule slips

A container leaves the factory with the penetrations it was drawn with. If the site contractor needs one more 4-inch gland, the options are to cut a hole in a finished, painted, insulated box on site — or to delay the project. We ask for the cable schedule before we cut.

Standard practice: split gland plates so cables can be added without disconnecting existing ones, spare ways capped and labelled, pipe penetrations with welded sleeves, an earthing boss at each corner, and lifting points marked with the centre of gravity.

For units that travel as freight, the CSC plate stays valid and the transport configuration is listed — with or without the fire cylinders, with or without batteries. Dangerous goods paperwork is a separate conversation and it is better had before the booking.

A generator container with access doors and ventilation grilles
Configuration templates

Eleven products, and the numbers each one is honest about

These are the builds we quote most often, not a second product list — the eleven cards above are the products. A build changes the moment your equipment, ambient or classification changes, which is why the price is per project.

Code Product Shell Thermal / duty Notes
EQP-BESS Battery storage 10 / 20 / 40 ft 5–25 kW cooling · clean agent C4 standard · 35-day typical build
EQP-GEN Generator & switchgear 20 / 40 ft 65–75 dB(A) @ 1 m · 500–2,000 L day tank Radiator air path calculated on the drawing
EQP-WATER Water treatment 10 / 20 / 40 ft 5–50 m³/h · dosing and pumps Floor sloped 1:100 · wet-tested in the yard
EQP-TELECOM Telecom & edge 10 / 20 ft 3–8 kW · 48 V DC plant IP55 · alarms to your NOC
EQP-CTRL Connection & control 20 / 40 ft 3–10 kW split between rooms Two rooms, sealed wall, cable void
EQP-LAB Laboratory 20 / 40 ft 1–4 hoods · 8–15 ACH Negative pressure −5 to −10 Pa
EQP-PUMP Pump & compressor 20 / 40 ft Ventilation only · 1,500 kg/m² floor Isolated frame · removable roof panel
EQP-SHELL Equipment shell 10 / 20 / 40 ft None or 50/100 mm PU Cut before coating · C4 or C5-M
EQP-SKID ISO skid base 10 / 20 / 40 ft ISO 4–40 t static Sea fastening at 2 g · certified lugs
EQP-HVAC Enclosure HVAC Fitted system 3–25 kW · 500–20,000 m³/h Free area stated · ATEX on request
EQP-HAZ Hazardous store 10 / 20 ft 110% integral bund · 6–12 ACH Signage set and drum ramp included

Every product is quoted against your equipment drawing. We list what we need from the equipment supplier before we can price it, so the first quote is not a placeholder. Options priced separately: acoustic lining, ATEX fans, fire-rated walls, C5-M coating, UPS, cameras.

How it is built

Six hold points, and you can attend any of them

01
Shell and paintCertified container or new-build frame, blasted and coated to the agreed corrosion class.
02
Insulation and liningPU or rock wool to the thermal requirement, vapour barrier, sealed floor, internal finish.
03
PenetrationsGland plates, pipe sleeves, spare ways — cut and finished from your cable schedule, not on site.
04
HVAC and fireCooling sized to the loss figure, ventilation interlocked, suppression and detection to the required standard.
05
ElectricalDistribution, earthing, lighting, sockets; factory-tested and labelled before shipment.
06
DocumentationAs-built drawing, test sheet, nameplate, spare parts list and O&M file travel with the unit.
How the number is made

Four answers turn an enclosure into a price

We are not the OEM of the battery, the switchgear or the genset — and that is an advantage: you keep your supplier’s warranty and we quote only the room around it.

01

What we need from you

  • Equipment drawing and heat loss in kW
  • Ingress, fire and (if relevant) explosion classification
  • Corrosion class: inland, coastal, offshore
  • Voltage, frequency and cable schedule
  • Destination climate and transport mode
02

How long to a number

  • 48 hours for a first-pass price with a general arrangement drawing
  • Options listed separately: fire kit, A/C, lining, paint system
  • Price held for 10 calendar days after configuration freeze
03

How long to a box

  • 30–60 days from drawing release and deposit; 35 days typical for a standard BESS
  • Custom families take the longer end — new frame, new tooling
  • Site work: foundation, cable termination and commissioning are yours or quoted separately

Quotation terms: quoted per project against the equipment drawing. The equipment itself (battery, switchgear, genset, process unit) is supplied by your OEM or sourced as a named make and quoted separately.

Questions we get

Straight answers

Do you build to ATEX or IECEx?We build the enclosure to the drawing an Ex-rated integrator specifies, including relief panels, gas detection and interlocked ventilation. The certification stays with the equipment and its integrator — we do not claim an Ex certificate for the box alone.
Can you supply the battery or the genset too?We can source it and integrate it, but we quote it as a named make with a model number so you can compare it against your own supplier. Our margin is on the room, not on hiding the equipment price.
What about the foundation?We provide a load plan and the lifting points. The plinth, the anchor bolts and the earthing grid are site work — we will review your drawing if you send it.
Is one unit a real order?Yes. These are not stock items, so a single unit is built to your drawing with the same hold points as a batch of twenty. The only thing that changes is the price per unit.
Can we inspect during the build?Three hold points are open to you: after coating, after lining and penetrations, and before the factory electrical test. Come to Shenzhen or join by video — we photograph every hold point either way.
What is the difference between a shell and a full room?A shell is the envelope only: cuts, doors, louvres, coating and insulation. A room adds the thermal system, the fire package, the electrical distribution and the testing. If you are fitting out locally, take the shell.

Send the equipment drawing. We will tell you what the room needs.

Equipment make and model, heat loss in kW, ingress and fire classification, corrosion class, voltage and cable schedule. If you only have a datasheet, send that and we will work from it.

Send the drawing container-nan@anchengtong.com · +86 177 2798 0755