Connection & Control Room — Cable Terminations, PLC and a Desk Somebody Can Sit At

Connection & Control Room — Cable Terminations, PLC and a Desk Somebody Can Sit At

Categories:

Two-room connection and control containers: gland plates and a cable void on one side of a sealed wall, a desk and comfort cooling on the other.

20–40 ftshell
2rooms
19 inrack bays
C4corrosion
01 / OVERVIEW

What it is for

This is the box that everyone forgets until commissioning week, when the cable schedule arrives and there is nowhere to terminate it. A control room is part electrical room, part workshop and part office, and those three uses have different requirements for floor, light and air.

We build it as two rooms: a termination and switchgear room with the gland plates and the cable void, and a control room with the desk, the video wall and the cooling that a person needs rather than the cooling a cabinet needs.

The reason to do it in a container is schedule. It arrives wired, labelled and tested, and the site work is the incoming cables and the earthing — a day rather than a month of building a room inside a shed.

Where it is typically used

Plant and process controlPLC, drives and the operator desk for a plant that has no permanent building.
Substation and network controlTermination of MV and LV cables with protection relays and a mimic panel.
Construction-phase controlA project office and control room that leaves with the project.
Water and waste plantsSCADA, dosing controls and a bench for the sampler.
02 / SPECIFICATIONS

Key specifications

Shell 20 ft or 40 ft HC, insulated, two-room layout
Room split Termination / switchgear room plus control room, separate doors
Cable entry Split gland plates sized to your cable schedule, spare ways capped, cable void under a removable floor
Cooling Control room 3–6 kW comfort cooling; equipment room 5–10 kW, separate systems
Power Distribution, UPS supply to the control desk, earthing boss at each corner
Lighting LED, 300–500 lux at the desk, emergency light with a 90-minute battery
Floor Vinyl in the control room, sealed deck plate in the equipment room, cable void between
Racking 19-inch bays and wall-mount brackets, loading stated
Fire Detection in both rooms, clean agent in the equipment room on request
Corrosion C4 standard, C5-M on request
Monitoring Temperature, humidity, door and smoke alarms to the site system
Design ambient −25 °C to +50 °C

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Two-room shell

Separate doors and a sealed wall between the electrical room and the desk, so a cable fault does not put the operator in the same compartment.

02Cable termination

Gland plates, cable void, earth bar and a schedule of every way, labelled before shipment.

03Switchgear and PLC

Panels mounted, wired to terminal blocks, tested and labelled — or space reserved for yours.

04Control desk

Desk, video wall bracket, UPS supply, task lighting and a chair rail.

05Comfort systems

Separate cooling for people and for cabinets; heating for cold sites.

06Documentation

Termination schedule, panel schedule, as-built and test sheet.

04 / MODELS

Which model to take

Model Shell Rooms Cable ways Use
EQ-CTRL-20 20 ft · 6,058 mm 2 12–24 Small plant control
EQ-CTRL-40 40 ft · 12,192 mm 2 24–48 Substation and network control
EQ-CTRL-40W 40 ft · 3 rooms 3 24–48 Control plus workshop plus store
EQ-CTRL-SG 40 ft · switchgear 1 24–48 Electrical room only, no desk

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

The cable schedule arrives late, so the spare ways have to arrive early

ENGINEERING NOTE

Every project adds cables

Nobody ever terminates fewer cables than the schedule said. The site contractor finds one more 4-inch gland, and the options are to cut a hole in a finished, painted, insulated box — or to delay the project.

We cut spare ways at the ratio of about one in four, cap them and label them. It costs very little at build time and it is the difference between a day and a week on site.

Two rooms, two climates

A person at a desk wants 22 °C and fresh air. A cabinet wants 25 °C and no dust. Serving both from one unit means one of them is wrong, so the rooms get separate systems and a sealed wall between them.

The wall also matters for fire: a cable fault in the termination room should not be in the same compartment as the operator.

Gland plate layout is issued for approval against your cable schedule. Spare ways are capped, labelled and counted on the drawing.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

You have a cable schedule and a PLC panel list.

The layout follows those two documents.

The site has no permanent building and the project has a schedule.

A container arrives tested.

You want the control room next to the plant, not 200 m away.

Short cable runs, short response time.

The room will hold more than 200 terminations.

At that size a site-built switch room is cheaper.

You need a manned 24-hour control centre.

That is a building with welfare facilities, not a container.

07 / DELIVERY

From contract to energisation

Data

Cable schedule, panel list, equipment heat load, desk layout, voltage.

Drawing

Two-room general arrangement, gland plate layout, panel schedule in 5–7 days.

Contract

Drawing release and deposit; switchgear and cooling ordered.

Production

30–45 days: shell, lining, floor void, penetrations, electrical, factory test.

Handover

Termination schedule, panel schedule, test sheet, as-built drawing and O&M file.

08 / GALLERY

On site and in detail

A control and connection container with louvred equipment doors
A control and connection container with louvred equipment doors
Walk-in container with cable entry and service door
Walk-in container with cable entry and service door
Cable entry and gland detail inside an equipment room
Cable entry and gland detail inside an equipment room
Control containers installed at a customer site
Control containers installed at a customer site

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Can you mount our switchgear?

Yes — send the panel drawings and we will build the mounting, the cable void and the termination space around them. We do not re-wire your panels.

How many spare ways should we take?

About one in four of your schedule. It is cheap at build time and expensive later.

Is the control room air conditioned?

Yes, separately from the equipment room, and sized for people rather than for cabinets.

Can the floor be raised?

A cable void under a removable deck plate is standard in the equipment room. A full raised access floor is available on the 40 ft.

Does it need a foundation?

A levelled pad or compacted gravel with a 150 mm tolerance. We provide the load plan and the lifting points.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the enclosure range

Product Details

Where the cables meet and someone has to be on shift

Half plant room, half office: cable termination space on one side, a control desk and panel wall on the
other, separated so that a fault on the terminals does not put the operator in the same compartment. Doors
both ends, lighting to a working level, and a floor you can pull a cable through.

Where it is used

At the interface between a utility feed and a plant, at the head of a conveyor or a pump station, and
anywhere a control room has to be within walking distance of the equipment it controls.

Key figures

  • 20 ft and 40 ft · split plant room / control room layout
  • Cable termination space with gland plates and earth bar
  • Panel wall, desk and lighting fitted to your single-line diagram
  • Insulated, ventilated or air-conditioned on the control side
  • Fire-rated separation between compartments

Built to order. The single-line diagram decides the layout.

gallery
RELATED PRODUCT
Card Eq Skid
Skid Base & Lifting Frame — ISO Corners, Lifting Lugs, Sea-Fastened
Grey equipment container with louvred doors standing on a yard
Generator & Switchgear Container — Sound-Attenuated Diesel and Gas Sets
Telecom equipment shelter with louvre panels (catalogue crop)
Telecom & Edge Equipment Shelter — Walk-In, IP55, DC Powered
Water treatment container with access doors (catalogue crop)
Water Treatment Container — Filtration, Dosing and Pump Sets Pipeless on Site
Contact us

Committed to providing customers with high-quality and reliable container solutions.