Pump & Compressor House — Heavy Floor, Acoustic Lining, Real Ventilation

Pump & Compressor House — Heavy Floor, Acoustic Lining, Real Ventilation

Categories:

Pump and compressor houses on an isolated frame, with the floor rated for the point load and ventilation calculated from motor losses rather than floor area.

20–40 ftshell
2–6pump sets
1,500kg/m² floor
65–75dB(A) at 1 m
01 / OVERVIEW

What it is for

Rotating equipment in a steel box gives you three problems that an office container does not: the floor has to carry the load and the vibration, the heat has to leave, and the noise has to stay in. Get any one wrong and the box is unusable.

A pump skid bolted straight to a container floor transmits vibration into the shell, and the shell becomes a loudspeaker. We build a isolated equipment frame on anti-vibration mounts, sized for the skid you are installing, with the floor plate designed for the point loads.

Ventilation is calculated from the motor losses plus the casing heat, not from the floor area. On a 40 ft box with four 30 kW sets that is a real number, and it is why the louvre area looks larger than you expect.

Where it is typically used

Water and wastewaterBooster, transfer and sewage pump sets at a site with no plant room.
Fire pump housesDuty, standby and jockey sets with a diesel driver, built to the local standard.
Compressed airAir-cooled compressors and dryers, with the heat rejection that decides the room.
Process circulationChilled water, glycol and CIP sets beside a plant that is outdoors.
02 / SPECIFICATIONS

Key specifications

Shell 20 ft or 40 ft HC, insulated, with a removable roof panel on request
Floor loading 1,500 kg/m² standard, higher on request with a stated point load
Vibration Isolated equipment frame on anti-vibration mounts, seismic restraint on request
Ventilation Louvres sized from motor losses plus casing heat, with thermostatic fans
Cooling None as standard — ventilation only; cooling on request for control cabinets
Acoustic 65–75 dB(A) at 1 m depending on lining and equipment
Drainage Sloped floor to a gully, bunded where the fluid demands it
Lifting Removable roof panel or a side hatch for pump replacement
Power Distribution, motor starters or VSDs, isolators beside each set
Penetrations Pipe sleeves welded and capped, spare ways for a future set
Corrosion C4 standard; C5-M and stainless wet areas on request
Design ambient −25 °C to +50 °C

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Heavy floor

Deck plate designed for the point loads of your skid, with grouting points marked.

02Isolated frame

Anti-vibration mounts and a frame that keeps the vibration out of the shell.

03Ventilation

Louvres and thermostatic fans sized from the motor losses, with a filter where the site is dusty.

04Drainage

Sloped floor, gully, sample point and a discharge connection.

05Access

Removable roof panel or hatch so a pump can be lifted out without cutting the box.

06Electrical

Distribution, starters or VSDs, isolators, and a control panel space.

04 / MODELS

Which model to take

Model Shell Sets Floor Ventilation
EQ-PUMP-20 20 ft · 6,058 mm 1–2 1,500 kg/m² Louvre + 2 fans
EQ-PUMP-40 40 ft · 12,192 mm 2–4 1,500 kg/m² Louvre + 4 fans
EQ-PUMP-40H 40 ft · heavy 2–4 2,500 kg/m² Louvre + 6 fans
EQ-AIR-40 40 ft · compressor 2–3 1,500 kg/m² Ducted, high volume

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

Vibration and heat, in that order, decide whether the box works

ENGINEERING NOTE

The shell is a loudspeaker

Bolt a pump skid directly to a container floor and the corrugated steel becomes a diaphragm. The noise inside the box goes up, the noise outside goes up, and the vibration finds every weld that was not designed for it.

An isolated frame on mounts, with the shell lined where the acoustics demand it, costs a fraction of a noise complaint and a re-weld.

Ventilation from losses, not from floor area

A 30 kW motor at 93% efficiency loses about 2.3 kW as heat, and the pump casing adds more. Four of those in a 40 ft box is roughly 10 kW that has to leave through louvres, and the louvre free area follows from the airflow, not from the wall size.

We calculate it, write it on the drawing, and specify thermostatic fans so the box is not drawing cold air all winter for no reason.

Motor losses, casing heat and the skid point loads are stated on the drawing. If the equipment changes after drawing release, the ventilation and the frame are recalculated.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

You have the pump or compressor datasheet with motor rating.

That gives us the losses and the point loads.

The set must be replaced by crane later.

We build a removable roof panel or a hatch.

The site is noise-sensitive.

Acoustic lining and isolated mounts are standard options.

The fluid is flammable or toxic.

That needs a classified enclosure with gas detection — a different design.

You need a sump below floor level.

A container has no basement; that is a civil structure.

07 / DELIVERY

From contract to energisation

Data

Pump or compressor datasheet, motor kW, point loads, fluid, ambient, noise limit.

Drawing

Layout, ventilation calculation, floor plate drawing in 5–7 days.

Contract

Drawing release and deposit; fans and acoustic lining ordered.

Production

30–45 days: shell, floor, isolated frame, ventilation, electrical.

Handover

Ventilation and noise test record, as-built drawing, O&M file.

08 / GALLERY

On site and in detail

A pump house container with louvred ventilation doors
A pump house container with louvred ventilation doors
Pump sets and manifolds installed inside a process container
Pump sets and manifolds installed inside a process container
Container exterior with louvre bank and access door
Container exterior with louvre bank and access door
Louvred panels and ventilation detail on an equipment container
Louvred panels and ventilation detail on an equipment container

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Can we install our own pumps?

Yes, and most customers do. We build the floor, the isolated frame, the sleeves and the ventilation around your datasheet, and you install the set.

How do we get a pump out later?

A removable roof panel on the 40 ft, or a side hatch on the 20 ft. Tell us the largest item and we will size the opening.

What noise level is realistic?

65–75 dB(A) at one metre with lining and isolated mounts. Below 65 needs a residential-grade enclosure and a different budget.

Is a fire rating needed?

For a fire pump house, usually yes, to the local standard. Send the requirement and we will quote to it rather than around it.

Can it be buried or partially buried?

Not our standard build. Below-grade installation changes the structural and waterproofing design completely.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the enclosure range

Product Details
gallery
RELATED PRODUCT
Card Eq Haz
Hazardous Waste & Chemical Store — Bunded, Ventilated, Signage That Passes Inspection
Card Eq Lab V2
Mobile Laboratory Container — Fume Extraction, Bench and a Sink That Drains
Telecom equipment shelter with louvre panels (catalogue crop)
Telecom & Edge Equipment Shelter — Walk-In, IP55, DC Powered
Card Eq Ctrl V2
Connection & Control Room — Cable Terminations, PLC and a Desk Somebody Can Sit At
Contact us

Committed to providing customers with high-quality and reliable container solutions.