Mobile Laboratory Container — Fume Extraction, Bench and a Sink That Drains

Mobile Laboratory Container — Fume Extraction, Bench and a Sink That Drains

Categories:

Mobile laboratories with one extract per fume hood, negative pressure held at −5 to −10 Pa, a chemical-resistant bench and a sink that actually drains.

20–40 ftshell
2–4fume hoods
−5 Panegative
C4corrosion
01 / OVERVIEW

What it is for

A laboratory in a container is a ventilation project with a bench in it. The fume hood decides the air balance, the air balance decides the HVAC, and the HVAC decides whether the room is usable in the climate it was shipped to.

We build labs for sample preparation, water and soil testing, cement and aggregate testing, and production quality control — the work where samples arrive on site and a result is needed the same day, not the work that needs a cleanroom classification.

Negative pressure, separate extract for each hood, a floor that resists the chemicals in use and a sink that actually drains to somewhere: those four things are what separates a laboratory from a container with a bench in it.

Where it is typically used

Mining and construction QAAggregate, cement, concrete cube and soil testing at the site gate.
Water and environmental samplingOn-site analysis with a negative-pressure wet lab.
Food and agricultural testingReceiving inspection where a delay means a spoiled load.
Production quality controlA bench beside the line, with the instruments that cannot travel to the office.
02 / SPECIFICATIONS

Key specifications

Shell 20 ft or 40 ft HC, insulated, wipe-clean lining
Fume hoods 1–4 bench or walk-in hoods, each with its own extract fan and duct
Air balance Negative pressure −5 to −10 Pa, 8–15 air changes per hour
Extract Ducted to atmosphere, stainless or PP where the chemistry demands it
Bench Epoxy resin or stainless worktop, chemical-resistant, with a drip lip
Sink Stainless, with a trap, a vent and a discharge to a site connection or a holding tank
Power Distribution with RCBO protection, isolated supplies for instruments, UPS on request
Gas Cylinder store outside the room, piped in with a regulator panel and a shut-off
Cooling 3–8 kW, sized for the instruments plus the air changes
Floor Chemical-resistant vinyl or epoxy, coved to the wall, with a drain
Monitoring Temperature, pressure differential and extract failure alarm
Design ambient −20 °C to +50 °C

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Insulated shell

PU panels, sealed and coved floor, wipe-clean wall lining.

02Fume extraction

Hood, duct, fan and discharge, one system per hood so a failure is contained.

03Bench and sink

Chemical-resistant top, drip lip, stainless sink with trap and vent.

04Air balance

Supply and extract sized to hold negative pressure, with a differential pressure gauge at the door.

05Services

Electrical with RCBO, instrument supplies, gas piping from an external cylinder store.

06Safety

Eyewash, spill kit, fire blanket, extinguisher bracket and a documented emergency procedure.

04 / MODELS

Which model to take

Model Shell Hoods Air changes Use
EQ-LAB-20 20 ft · 6,058 mm 1 8–10 ACH Single-bench sample prep
EQ-LAB-20D 20 ft · divided 2 10–12 ACH Two benches, separate extract
EQ-LAB-40 40 ft · 12,192 mm 3–4 12–15 ACH Full testing laboratory
EQ-LAB-40W 40 ft · wet + dry 2 12–15 ACH Wet chemistry plus instrument room

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

Negative pressure is the safety system; the hood is only the extract

ENGINEERING NOTE

The room must be lower pressure than the corridor

A fume hood extracts at the hood. A negative-pressure room extracts slightly more air than it supplies, so any leak in the envelope goes inward. Those are different systems and a lab needs both.

We hold −5 to −10 Pa and fit a gauge you can read from the door, because the failure you must catch is the fan that stopped, not the hood that is working.

Ducting is where the plan meets the roof

Each hood needs its own duct to atmosphere. On a 40 ft shell with four hoods, that is four penetrations, four fans and a roof that must stay watertight. The layout is drawn before the roof is cut.

Where the chemistry is corrosive the duct is stainless or PP, and the fan is rated for the vapour rather than for air. That is a cost decision to make at quotation, not after the first hood corrodes.

The air balance calculation is issued with the drawing and re-run if the hood count changes. Pressure differential is measured and recorded at the factory test.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

Samples arrive on site and results are needed the same day.

That is exactly what a mobile lab is for.

You need a wet lab with extraction and a drain.

Our standard build already has both.

The lab is temporary or the site will move.

Lift it and take it along.

You need a cleanroom classification.

That is a different envelope, with a different air-handling design.

You need a BSL-3 or equivalent containment.

Not a product we build, and we will say so rather than quote it.

07 / DELIVERY

From contract to energisation

Data

Work to be done, hood count, chemicals in use, instruments and their heat load, drain route.

Drawing

Layout, air balance and duct route in 7–10 days.

Contract

Drawing release and deposit; hoods and fans ordered.

Production

35–50 days: shell, lining, penetrations, bench, services, factory air-balance test.

Handover

Air balance record, pressure test, as-built drawing, O&M file and a safety pack.

08 / GALLERY

On site and in detail

A laboratory container with windows and a service door
A laboratory container with windows and a service door
Bench and instrument layout inside a testing laboratory
Bench and instrument layout inside a testing laboratory
Interior of a laboratory container during fit-out
Interior of a laboratory container during fit-out
Laboratory container exterior with glazed panels
Laboratory container exterior with glazed panels

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Do you supply the fume hood?

Yes, or we build the room around yours. The extract calculation starts from the hood’s face velocity and its own pressure drop.

Can the sink drain to a holding tank?

Yes. Where there is no site drain we fit a tank under the floor with a level alarm and a pump-out connection.

What about gas cylinders?

Stored outside in a ventilated locker, piped in through a regulator panel with an emergency shut-off inside the door. A cylinder inside the room is a fire load, not a convenience.

Is it suitable for a hot climate?

Yes, but the air changes are the load — 15 ACH at 45 °C outside is a bigger cooling duty than the instruments. We size for it.

Can we work in it while it is being shipped?

No. Instruments travel separately or are packed and braced; the O&M file lists what must be removed before transport.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the enclosure range

Product Details
gallery
RELATED PRODUCT
Card Eq Haz
Hazardous Waste & Chemical Store — Bunded, Ventilated, Signage That Passes Inspection
Grey equipment container with louvred doors standing on a yard
Generator & Switchgear Container — Sound-Attenuated Diesel and Gas Sets
Telecom equipment shelter with louvre panels (catalogue crop)
Telecom & Edge Equipment Shelter — Walk-In, IP55, DC Powered
Water treatment container with access doors (catalogue crop)
Water Treatment Container — Filtration, Dosing and Pump Sets Pipeless on Site
Contact us

Committed to providing customers with high-quality and reliable container solutions.