Heat Rejection Skid — 300 to 1,500 kW of Dry Cooling

Heat Rejection Skid — 300 to 1,500 kW of Dry Cooling

Categories:

300–1,500 kW of dry cooling with a glycol loop and pump set, sized on your wet-bulb, altitude and glycol concentration.

300–1,500kW
8fans max
dryno water use
8–10 °Capproach
01 / OVERVIEW

What it is for

A water-cooled container is only as good as the cooler behind it. Size the cooler at the load and the loop runs hot on the hottest week; size it for the ambient you actually get and it runs at design all year.

The skid arrives with the coil, the fans, the pump set and the controls on one frame, so the site work is two pipe connections and a power feed.

Where it is typically used

Hydro containersOne skid per two to four boxes, or one per box on hot sites.
Hot climatesDry cooling where a wet tower would evaporate too much water.
Cold climatesNo water inventory to freeze if the glycol is right.
Noise-sensitive sitesLow-speed fans and a setback position.
02 / SPECIFICATIONS

Key specifications

Capacity 300–1,500 kW at design ambient
Coil Finned copper or aluminium, 2–6 rows
Fans 4–8 axial, EC or AC, variable speed
Approach 8–10 °C above ambient at design
Loop Glycol, 60–300 m³/h, DN50–DN100 headers
Pump set Primary/secondary, N+1 on request
Noise 55–65 dB(A) at 10 m depending on fan speed
Build time 35–45 days

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Coil bank

Finned coil sized on wet-bulb, altitude and glycol concentration.

02Fan deck

Axial fans with guards, variable speed and a maintenance walkway.

03Pump set

Primary and secondary pumps with strainers and a bypass.

04Frame

Galvanised skid with lifting points and a bunded drip tray.

05Controls

VFD panel, temperature control and dry contacts to the site PLC.

04 / MODELS

Which model to take

Model Capacity Fans Flow Boxes
MC-HX-300 300 kW 4 60 m³/h 1 × 20 ft
MC-HX-600 600 kW 6 60 m³/h 1 × 40 ft
MC-HX-1300 1,300 kW 8 150 m³/h 1 × 40 ft + margin

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

Altitude eats fan capacity before temperature does

ENGINEERING NOTE

At 2,000 m the same fan moves 20% less air

Air density falls with altitude, and a fan is a volume machine, so the mass flow — and therefore the heat rejection — falls with it. A cooler chosen at sea level and installed at 2,000 m will not make its rating, and the loop will run hot while nobody can explain why.

We correct for altitude, glycol concentration and coil fouling before quoting a capacity, and we write the assumptions on the drawing.

Cooler selection is issued with the altitude, wet-bulb and glycol concentration it was calculated at.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

You run hydro containers.

This is the other half of the system, not an accessory.

Water is scarce or expensive.

Dry cooling uses no water at all.

Your ambient peaks at 50 °C.

The approach becomes uneconomic; adiabatic or water cooling is the honest answer.

You have a large cooling tower already.

Tie in rather than duplicate, and send us the curve.

07 / DELIVERY

From contract to energisation

Data

Ambient, altitude, wet-bulb, glycol %, loop flow.

Selection

Cooler curve and fan power in 5 days.

Production

35–45 days.

Site

Two pipe connections, one power feed, one day to commission.

08 / GALLERY

On site and in detail

A dry cooler skid with axial fans
A dry cooler skid with axial fans
Fan and pump control panel
Fan and pump control panel
Cooler set back from the container row
Cooler set back from the container row
Skid prepared for shipping
Skid prepared for shipping

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Can it run dry in winter?

Yes, with the glycol concentration set for the site minimum and fan speed control.

How often does the coil need cleaning?

Twice a year in a dusty site, once in a clean one. Access is from the fan deck.

Can two skids be paralleled?

Yes, with a common header and balancing valves.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the mining range

Product Details
gallery
RELATED PRODUCT
A containerised transformer and switchgear skid outdoors
Mining Substation & Paralleling Skid — 1.25 to 2.5 MVA
An immersion-cooled mining container with tanks of dielectric fluid
40HC Immersion Mining Container — Up to 1.4 MW in Dielectric Fluid
A 20-foot water-cooled mining container on a paved site
20GP Water-Cooled Mining Container — 96 Hydro Units at 0.55 MW
Water-cooled mining containers in a row along a street
Water-Cooled Mining Farm — 2 to 10 MW with a Shared Heat Rejection Loop
Contact us

Committed to providing customers with high-quality and reliable container solutions.