Detection & Suppression — Clean Agent for Mining Containers

Detection & Suppression — Clean Agent for Mining Containers

Categories:

Early smoke detection, clean-agent cylinders and a power interlock that cuts the fault before the agent discharges.

40–120m³ covered
30 sdetection
cleanagent
interlockpower cut
01 / OVERVIEW

What it is for

A mining container has two fire risks that behave differently: a PSU that fails hot, and a cable joint that arcs. Both give smoke before they give flame, which is why detection matters more than the extinguishing agent in the first thirty seconds.

We supply early smoke detection, clean-agent cylinders, the manifold and a relay that cuts power before the agent discharges — because discharging into a live busbar does not fix the fault.

Where it is typically used

High-value containersWhere a fire means 336 machines, not one.
Unmanned sitesDetection has to work without anyone on the pad.
Insurance requirementsSome underwriters ask for clean agent and a power interlock.
RetrofitCylinders and manifold fit into an existing box in a day.
02 / SPECIFICATIONS

Key specifications

Coverage 40, 80 or 120 m³ per set
Agent Clean agent, NOVEC 1230 or FK-5-1-12 equivalent
Detection Aspirating smoke detection, two-stage alarm
Cylinders 2–6 × 40 L, manifolded
Interlock Shunt trip on the main breaker before discharge
Alarm Dry contacts to the site PLC and a local sounder
Discharge 10 seconds, nozzle layout per cylinder calculation
Build time 10–15 days, installation 1 day

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Cylinders

Manifolded cylinders on a rack, with pressure gauges facing the door.

02Detection

Aspirating pipe or point detectors, two-stage alarm logic.

03Pipework

Red painted manifold and nozzles laid out per the discharge calculation.

04Interlock

Shunt trip and a relay that drops the PDU before the valve opens.

05Documentation

Discharge calculation, cylinder weights and the test record.

04 / MODELS

Which model to take

Model Coverage Cylinders Detection Interlock
MC-FIRE-40 40 m³ 2 × 40 L Aspirating Shunt trip
MC-FIRE-80 80 m³ 3 × 40 L Aspirating Shunt trip
MC-FIRE-120 120 m³ 6 × 40 L Aspirating + point Shunt trip

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

Cut the power first, then discharge

ENGINEERING NOTE

A live arc will re-ignite after the agent clears

Clean agent works by removing heat and interrupting the chain reaction, but it does not stop a fault current. If the main breaker is still closed, the joint that started the fire is still arcing and the fire comes back as soon as the concentration drops.

So the sequence is detection, alarm, power cut, discharge. The interlock is not an optional extra and we do not supply a set without it.

Cylinder weights are recorded at commissioning and re-checked annually; a slow leak is the most common failure.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

The container is unmanned for most of the year.

Nobody is there to use an extinguisher.

Your insurer asks for clean agent.

The documentation is written for a surveyor, not for a brochure.

The site has a water supply and a fire brigade on call.

Water mist or nothing at all may be accepted; we will say so.

Nobody will check cylinder weights annually.

An unmaintained system is worse than none, because it is assumed to work.

07 / DELIVERY

From contract to energisation

Survey

Volume, layout, existing detection, interlock point.

Design

Discharge calculation and nozzle layout in 5 days.

Supply

Cylinders, pipework and panel in 10–15 days.

Commission

Installation in a day, weights recorded, test certificate issued.

08 / GALLERY

On site and in detail

Clean agent cylinders in a container
Clean agent cylinders in a container
Interlock and alarm panel
Interlock and alarm panel
Nozzle and detection pipe above the aisle
Nozzle and detection pipe above the aisle
Detection coverage over the machine rows
Detection coverage over the machine rows

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Which agent do you use?

NOVEC 1230 or an equivalent FK-5-1-12 fluid, depending on what is available in the destination country.

How often does it need servicing?

Annual weight and pressure check; the detection pipe needs blowing through at the same visit.

Can it cover two containers?

Only with two independent sets. A shared cylinder bank across a wall is not accepted by most insurers.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the mining range

Product Details
gallery
RELATED PRODUCT
Electrical distribution cabinet inside a mining container
Mining PDU & Monitoring — Per-Position Metering and Remote Power Cycling
A dry cooler heat rejection skid with axial fans
Heat Rejection Skid — 300 to 1,500 kW of Dry Cooling
A 20-foot water-cooled mining container on a paved site
20GP Water-Cooled Mining Container — 96 Hydro Units at 0.55 MW
A 40-foot water-cooled mining container outdoors at dusk
40HC Water-Cooled Mining Container — 210 S21 Hydro Units at 1.2 MW