Mining PDU & Monitoring — Per-Position Metering and Remote Power Cycling

Mining PDU & Monitoring — Per-Position Metering and Remote Power Cycling

Categories:

Per-position metering, remote power cycling and temperature alarms on one dashboard, 8 to 32 positions per cabinet.

8–32positions
per-socketswitching
SNMPand Modbus
1 Uper strip
01 / OVERVIEW

What it is for

When one machine starts drawing 300 W more than its neighbours, you want to isolate it from a browser, not from a busbar. That is the whole value of a metered, switchable PDU — and it is the part most containers skimp on.

We supply the strips, the cabinet, the metering and the dashboard as one item, wired per position and labelled to match the machine map.

Where it is typically used

Mining containersPer-position metering and remote cycling without a site visit.
Multi-tenant sitesBill each customer on measured consumption.
Unmanned sitesReboot a hung machine from a phone.
TroubleshootingFind the failing PSU before it takes a row down.
02 / SPECIFICATIONS

Key specifications

Positions 8, 16, 24 or 32 per cabinet
Sockets C19 and C13 mix, or L6-30R for US builds
Metering Per socket, ±1% class
Switching Per socket, relay or solid state
Protocol SNMP v3, Modbus TCP, REST
Input 3-phase, 400/415 V, up to 800 A
Mounting 19-inch, 1 U per strip, front accessible
Build time 15–20 days

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01PDU strips

1 U strips with per-socket metering, mounted at standing height.

02Cabinet

Steel enclosure with a lock, a fan and a DIN rail for the gateway.

03Gateway

One controller per cabinet, SNMP and Modbus, local web page.

04Cabling

UL-listed copper to the strips, terminated and tested.

05Labels

Position map printed and matched to the switch ports.

04 / MODELS

Which model to take

Model Positions Sockets Switching Input
MC-PDU-08 8 C19 Relay 3 × 63 A
MC-PDU-16 16 C19 / C13 Relay 3 × 125 A
MC-PDU-28 28 C19 + C13 Relay 3 × 250 A

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

Per-socket metering pays for itself in one bad batch of PSUs

ENGINEERING NOTE

You cannot fix what you cannot see

A container with one meter on the main breaker tells you the total and nothing else. When a row starts tripping, the difference between a failing PSU, a bad cable and a hot spot is visible only per position.

Metered strips cost a few percent of the box and they are the difference between a two-hour fix and a two-day one.

The position map is handed over as a printed sheet and a CSV, so it can be imported into the site dashboard.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

The site is unmanned or remotely managed.

Remote cycling is the main reason to buy it.

You resell power to tenants.

Measured billing removes the argument.

You have eight machines and a wall panel.

The dashboard is overkill; a breaker is enough.

Your network is air-gapped and stays that way.

Buy the metering but skip the gateway.

07 / DELIVERY

From contract to energisation

Data

Position count, socket type, voltage, protocol.

Build

15–20 days including test.

Test

Every socket cycled and metered before dispatch.

Handover

Label sheet, CSV map and the gateway config file.

08 / GALLERY

On site and in detail

PDU cabinet inside a mining container
PDU cabinet inside a mining container
Distribution cabinet with branch breakers
Distribution cabinet with branch breakers
Strips mounted alongside the machine rows
Strips mounted alongside the machine rows
Service aisle with the cabinet at the end
Service aisle with the cabinet at the end

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Can it retrofit into our existing boxes?

Yes, if the cabinet has space and the cable schedule is known. We supply the strips and the gateway separately.

Does it work without internet?

Yes. The gateway runs a local page and buffers data; the cloud link is optional.

What is the switching life?

100,000 operations for the relay type, which is well beyond a five-year service life.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the mining range

Product Details
gallery
RELATED PRODUCT
A dry cooler heat rejection skid with axial fans
Heat Rejection Skid — 300 to 1,500 kW of Dry Cooling
A containerised transformer and switchgear skid outdoors
Mining Substation & Paralleling Skid — 1.25 to 2.5 MVA
An immersion-cooled mining container with tanks of dielectric fluid
40HC Immersion Mining Container — Up to 1.4 MW in Dielectric Fluid
20 ft mining container with doors open (catalogue crop)
40HC Air-Cooled Mining Container — 336 Machines at 180 kW
Contact us

Committed to providing customers with high-quality and reliable container solutions.