Water-Cooled Mining Farm — 2 to 10 MW with a Shared Heat Rejection Loop

Water-Cooled Mining Farm — 2 to 10 MW with a Shared Heat Rejection Loop

Categories:

A 2–10 MW water-cooled mining farm with a shared dry-cooler loop: 1.2 MW per 40 ft container and about a third of the footprint of an air-cooled site.

2–10 MWsite capacity
1.2 MWper 40 ft box
1 / 3of the footprint
57 dB(A)at 10 m
01 / OVERVIEW

What it is for

Water-cooled farms exist because air cannot get the heat out at the density the machines now run at. The trade is that the heat rejection moves outside the box and becomes a site system: a loop, a pump set, a dry cooler bank and a water or glycol inventory that somebody has to maintain.

We build that as one package — hydro containers, shared dry cooler bank, primary/secondary pumping and the control that keeps the two in step. The reason to do it as one package is simple: a container that expects 150 m³/h and a cooler bank that delivers 120 m³/h will both run, and both will be wrong.

Where this stops making sense is where water is scarce or the winter is hard. A dry cooler handles both, a wet cooling tower does not, and an adiabatic unit sits in between with a water bill attached.

Where it is typically used

Dense sites1.2 MW in the footprint of a 40 ft box — roughly seven times an air-cooled unit.
Noise-sensitive locations57 dB(A) at ten metres puts the fence line where a town will accept it.
Hot climatesThe loop does not care whether the ambient is 45 °C, as long as the dry cooler is sized for it.
Expansion on a fixed padMore megawatts without more containers.
02 / SPECIFICATIONS

Key specifications

Site capacity 2–10 MW, 1.2 MW per 40 ft container
Containers 210 × S21 hydro per box, 2 racks × 7 layers × 15
Loop 40% ethylene glycol, 150 m³/h per box, DN57 304 stainless
Heat rejection Shared dry cooler bank, 1,306.8 kW per box of capacity
Approach 8–10 °C above ambient at design wet-bulb
Pumping Primary variable speed, secondary constant, N+1
Make-up Glycol top-up point per loop, 200 L expansion vessel
Noise 57 dB(A) at 10 m for the container, 62 for the cooler bank
Footprint About 380 m² for 10 MW including the cooler bank
Build time 35–50 days per box, 10–14 weeks to energise
Control PLC interlinking CDU, pumps and cooler fans
Standard CSC shell, PED-ready pressure parts on request

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Hydro containers

210 S21 hydro units each, manifolded at fifteen outlets per rack side.

02Dry cooler bank

Finned coil, axial fans, sized on your wet-bulb and altitude rather than a catalogue.

03Pump and valve set

Primary/secondary with strainers, bypass and a fill point that a site technician can reach.

04Loop pipework

Pre-fabricated spools to the cooler bank, insulated, pressure-tested before shipping.

05Control

One PLC per farm, dry contacts to your SCADA, alarm on differential pressure and tank level.

06Commissioning

Flush, fill, leak test at 1.5× working pressure, then 72 hours under load.

04 / MODELS

Which model to take

Stage Containers Load Cooler bank Footprint
Stage 1 3 3.6 MW 4 × 1.3 MW ≈ 150 m²
Stage 2 5 6.0 MW 6 × 1.3 MW ≈ 220 m²
Stage 3 8 9.6 MW 9 × 1.3 MW ≈ 330 m²
Stage 4 10 12 MW 12 × 1.3 MW ≈ 380 m²

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

The number that decides a water-cooled farm is the approach temperature

ENGINEERING NOTE

Dry cooler sizing is not a catalogue pick

A dry cooler rated at 1,306.8 kW against a 1,200 kW load is not 8.9% generosity for its own sake. It is what you need when the ambient hits its design maximum and the coil has been through a summer of dust. Size it at the load and the loop runs at 45 °C instead of 40, the machines throttle, and the farm produces less than the nameplate.

Altitude matters as much as ambient. At 2,000 m the air is thin enough that the same fan moves about 20% less mass, and the coil has to grow to compensate.

Glycol concentration is a freeze decision

40% ethylene glycol protects to about −24 °C. If your site sees −35 °C you need 50%, and the same loop then carries about 8% less heat per litre, which goes back into the cooler sizing. It is cheaper to tell us the winter minimum than to discover it in January.

Cooler bank sizing is issued with the wet-bulb and altitude assumptions written on it, so the number can be checked later.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

You need more than 400 kW on a pad that will not grow.

This is the case water cooling was invented for.

There are neighbours within 200 m.

The container runs at 57 dB(A); the cooler bank is the louder of the two and can be placed away from the fence.

Your site freezes but you can maintain glycol.

Dry cooling handles frost without a water inventory if the concentration is right.

Nobody on site can maintain a loop.

A pump seal, a strainer and a glycol test every quarter are not optional. Without them, air cooling is the honest answer.

Water or glycol delivery to site is difficult.

A 10 MW farm holds several tonnes of fluid. If a truck cannot reach the site, rethink.

07 / DELIVERY

From contract to energisation

Site data

Ambient max/min, wet-bulb, altitude, water quality, noise limit at the fence.

Scheme

Loop diagram, cooler layout and stage plan in 7–10 working days.

Contract

Drawing release; coolers and containers ordered in parallel.

Production

35–50 days per container, cooler bank 45–60 days.

Commissioning

Flush, fill, pressure test, then 72 hours at design load with the ambient logged.

08 / GALLERY

On site and in detail

Hydro containers in a row with the loop trench in front
Hydro containers in a row with the loop trench in front
Container shell before the manifolds go in
Container shell before the manifolds go in
Service aisle between hydro racks
Service aisle between hydro racks
Site with cooler bank set away from the container row
Site with cooler bank set away from the container row

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Can the dry cooler sit on the container roof?

On a 20 ft box, sometimes. On a 40 ft at 1.3 MW, the coil area will not fit and the structure will not carry it. Plan a grade-level bank.

What if we already have a cooling tower?

We can tie into it, but a tower delivers colder water than the loop needs and brings water treatment with it. Send the tower curve and we will tell you whether it is worth it.

How much glycol does a 10 MW farm need?

Roughly 1.8 m³ per container plus the cooler bank and pipework — around 22 m³ at 10 MW. Budget for a delivery and a spill kit.

Is 57 dB(A) measured or calculated?

Measured on a supplied unit at ten metres, free field. The cooler bank is calculated and we will not quote a number we have not tested.

What happens on a pump failure?

N+1 pumping with automatic changeover, and the PLC drops the load on the affected loop rather than letting it overheat.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the mining range

Product Details
gallery
RELATED PRODUCT
Clean agent fire suppression cylinders inside a container
Detection & Suppression — Clean Agent for Mining Containers
A dry cooler heat rejection skid with axial fans
Heat Rejection Skid — 300 to 1,500 kW of Dry Cooling
Row of air-cooled mining containers deployed as a farm
Air-Cooled Mining Farm — 2 to 10 MW in 40 ft Containers
20 ft mining container with doors open (catalogue crop)
40HC Air-Cooled Mining Container — 336 Machines at 180 kW
Contact us

Committed to providing customers with high-quality and reliable container solutions.