40 ft Containerised Data Hall

40 ft Containerised Data Hall

One 40 ft container, seven racks and a 400 kVA UPS, run at full load before dispatch and live on site the day it lands.

7standard racks
400kVA UPS
15minutes autonomy
250–350kW IT load
01 / OVERVIEW

What it is for

This is the base unit: a 40 ft high-cube with seven 600 × 1200 racks in two rows facing each other, sealed into a cold aisle. UPS and distribution at one end, fire cylinders at the other.

It ships in the largest numbers because it covers the widest range of situations: factory own-use, park branch sites, hospital imaging departments, university compute rooms, mine dispatch rooms. The requirement is much the same everywhere: a few dozen racks, a few hundred kilowatts, and space for someone to walk in and work.

The enclosure is completed in the factory, including insulation, floor, cable trays, wiring, pressure testing and fire pipework. It runs at load once before dispatch and the record ships with it. On site you connect utility power and fibre and switch on.

Seven racks is not a guess. Internal length is 12.03 m; take 1.2 m at each end for plant and 9.6 m remains. Two rows of three racks at 1.2 m deep use 3.6 m, and the last position takes a rack PDU or a precision air conditioner, which makes seven. An eighth would mean giving up aisle width, and a loaded trolley would no longer pass.

Where it is typically used

Factory own-use data roomMES, ERP, warehouse systems and site CCTV archive. A few dozen racks, and someone needs to be able to work inside.
Hospital imaging departmentPACS archive: large and growing data volumes, and high expectations of supply continuity.
University compute centreTeaching and research sharing the same equipment, with load that swings, so scheduling matters.
Mine and construction site dispatchRemote sites with poor conditions where civil construction is expensive. The enclosure moves with the project.
02 / SPECIFICATIONS

Key specifications

Enclosure size 12.03 × 2.35 × 2.69 m (40 ft high cube)
Internal clear height 2.55 m
Racks 7 × 600 × 1200 × 2000 mm, 42U
Power per rack 8–25 kW air-cooled, up to 35 kW with enhanced cooling
Total IT load 250–350 kW
UPS 400 kVA modular, 96% double conversion
Autonomy 15 minutes on LFP, extendable to 30
Cooling 2 × 35 kW precision units, N+1; or one 70 kW chilled-water unit
Air distribution Underfloor supply with sealed cold aisle
Fire HFC-227ea or FK-5-1-12, double-interlock pre-action
Enclosure IP54, 1.5 mm corrugated steel skin with 100 mm rock wool
Floor loading 8 kN/m², 12 kN/m² in the rack zone
Ambient temperature −20 °C to +45 °C

Figures are for the standard configuration and change with the project. Values are design values; acceptance follows the contract technical agreement.

03 / WHAT IS INSIDE

What goes in the box

Installed, wired and tested before dispatch. On site the work is placement and external connections.

01Enclosure

1.5 mm corrugated steel skin, 100 mm rock wool core, polyurethane seals, damp-proof membrane in the floor.

02Rack row

Seven 42U racks, perforated front doors, double rear doors, top cable entry, dual PDU per rack at 32 A or 63 A.

03Cold aisle

Frame, clear roof panels and glass end doors, so supply and return air stop mixing.

04UPS and distribution

400 kVA modular UPS, incoming, outgoing and rack panels, all at one end of the enclosure.

05Precision cooling

2 × 35 kW downflow units, N+1, condensate drained to a single point.

06Fire

Cylinder bank, pre-action valve, smoke and heat detection, sounder beacons, pressure relief.

07Monitoring

Temperature, humidity, leak, access, smoke and UPS status, reported over one 4G link.

04 / MODELS

Which model to take

Model IT load Racks UPS Cooling Notes
AIDC-40S 250 kW 7 400 kVA 2 × 35 kW Single path
AIDC-40D 350 kW 7 400 kVA × 2 2 × 35 kW Dual path 2N
AIDC-40L 350 kW 7 400 kVA × 2 70 kW chilled water Liquid-ready

Standard models are listed. Other capacities are built to order, with two to three weeks added to the standard lead time.

05 / TECHNICAL NOTES

What cold aisle containment actually saves, and why so many halls get it wrong

ENGINEERING NOTE

First, how heat moves in a hall

A rack draws cold air at the front and discharges hot air at the back. If supply and return mix in the room, the return temperature drops, the unit has to supply colder air to compensate, and cooling capacity is wasted. The industry calls this recirculation.

In an uncontained hall, separation depends on buoyancy, supply volume, ceiling height and rack layout. Done badly, cold air leaves the floor and goes straight back to the return grille, and the rack fronts get nothing.

Containment closes the intake face of the row: roof panels, end doors, and blanking panels between racks. Cold air can only enter the aisle from the floor and leave through the rack fronts. With the bypass gone, return air reaches 35–38 °C, the sensible heat ratio improves and cooling efficiency follows.

What it saves

On our own measurements, a 250 kW hall with open rack layout spends about 38% of total electricity on cooling. Contained, that falls to roughly 26%, and whole-hall PUE goes from 1.62 to 1.38. The size of the gain depends on the starting point: a hall that was already well laid out improves less.

It saves more than electricity. Warmer return air lets the units run at a higher evaporating temperature, compressor starts drop, and equipment lasts longer.

The cost is a cold aisle at 22–24 °C, so anyone working inside needs a jacket, sprinkler heads have to be repositioned, and rack door airflow has to match the containment or you have sealed a space that still gets too little air.

Three common mistakes

First, no blanking panels. Empty U positions left open leak cold air through the gaps and the containment does nothing. It is the cheapest fix in the hall and the most often skipped.

Second, floor grilles in the wrong place. Perforated tiles in the aisle have to face the rack intakes, with open area set by load. We have seen a whole aisle paved with grilles, airflow distribution completely uncontrolled and the last racks overheating.

Third, end doors propped open. Someone wedges one open for convenience and the aisle becomes an open aisle again. Only procedure and access control fix that, and a door contact alarm works better than any instruction.

The benefit of containment depends on the starting design. In a hall that already separates hot and cold, has blanking panels and tuned floor grilles, containment adds only 5%–8%. Do not promise 20%.

06 / SELECTION

When to use it, when not to

These come from projects rather than general advice. Match your case against them; it is more useful than reading the specification table.

A few dozen racks, under 300 kW, staff need to work inside

This is the standard AIDC-40 case and the best value in the range.

Over 40 kW per rack

Air cooling cannot keep up, and there is no internal space for liquid pipework. Move to the liquid-cooled AIDC-IT.

Remote site with no local maintenance

Factory pre-commissioning plus remote monitoring covers the gap until someone arrives.

2N required and over 30 kW per rack

Space inside the enclosure becomes very tight. Split into an IT module and a separate power module.

07 / DELIVERY

From contract to energisation

Confirm requirements · 3 days

Rack count, power per rack, 2N or not, fire agent.

Drawing approval · 1 week

Layout, single-line diagram, interface drawing, signed by the customer.

Production · 4–5 weeks

Enclosure conversion, insulation, assembly, wiring, pressure testing.

FAT · 2 days

Load test, fire interlock, transfer test, report issued.

Transport and lifting · 3–5 days

Shipped as an abnormal load, positioned and connected on site.

08 / GALLERY

On site and in detail

Two rack rows facing each other with the cold aisle sealed between them
Two rack rows facing each other with the cold aisle sealed between them
Inside the cold aisle, perforated tiles aligned with the rack intakes
Inside the cold aisle, perforated tiles aligned with the rack intakes
UPS and distribution zone at one end of the enclosure
UPS and distribution zone at one end of the enclosure
Whole-enclosure lift on four lugs, connected to utility power after placement
Whole-enclosure lift on four lugs, connected to utility power after placement

Some images are scheme illustrations and renders showing structure and layout. Final delivery follows the contract drawings.

09 / FAQ

What customers ask most

Are seven racks enough?

At 15 kW per rack that is 105 kW of real load, which covers a mid-sized factory or a branch office for five to eight years. Beyond that, nine racks means giving up aisle width, or a second enclosure.

Can both aisles be contained?

Yes, known as dual containment or cold plus hot aisle containment. Hot aisle containment puts demands on the return path and space inside the enclosure is tight, so it is normally only done at high power density.

Does the UPS have to be 400 kVA?

At 350 kW and 0.9 power factor you need 389 kVA, so 400 kVA is the match. If the real load is 200 kW you can drop to 250 kVA and save a noticeable amount.

HFC-227ea or FK-5-1-12?

HFC-227ea is cheaper but has a high global warming potential and is already restricted in parts of Europe and North America. FK-5-1-12 costs 30%–40% more, is environmentally acceptable and leaves almost no residue. For European delivery, take FK-5-1-12.

Can it sit outdoors?

It is an outdoor product. Watch foundation drainage and roof snow load, which rises to 1.5 kN/m² in northern regions.

How noisy is it?

About 65–70 dB(A) at one metre, dominated by the condenser fans. Near housing you need an acoustic hood or a move to the boundary.

Ask for a scheme for your site

Send the capacity, rack count, site conditions and local climate. You get a layout, a single-line diagram and a price, at no charge, revised until it works.

See the full range

Product Details

A data hall that arrives with its power path already tested

Seven racks in a 40 ft shell, fed from a 1,000 × 800 mm ATS changeover cabinet, through a
400 kVA online double-conversion UPS. Load never sees raw mains. Battery autonomy is written in minutes
at full load — fifteen as standard — because that is the number an operator is judged on.

Who puts one on the ground

Telecom operators adding capacity faster than they can pour concrete. Mining and industrial sites that
need compute next to the load rather than 400 km away. Event and broadcast crews who need a hall for six
weeks and a truck to take it away. In each case the building is the slow part, not the IT — so the
building is the part we ship.

Key figures

  • 40 ft ISO shell, 2,430 mm external width, single aisle
  • 7 racks · 14 server positions · two PDUs per rack, branch protection per server
  • 400 kVA online double-conversion UPS · 15 min autonomy at full load
  • 7 in-row precision cooling units · chilled-water interface to an outdoor chiller
  • NH-200 clean agent suppression with detection, discharge and alarm
  • Design ambient stated on the drawing — 35 °C by default, not by assumption

Built to order. Price depends on the UPS rating, battery minutes and whether you supply
the chiller. Send the load schedule and we quote against it.

gallery
RELATED PRODUCT
AIDC power — main image
Power Module (UPS & Distribution)
AIDC pair20 — main image
20 ft Twin-Module Data Centre
Edge data centre container on a concrete pad (catalogue crop)
20 ft Edge Data Centre
Prefabricated IT modules lined up at the factory (catalogue crop)
IT Module (Rack Module)
Contact us

Committed to providing customers with high-quality and reliable container solutions.