Dumas, Texas: a water-cooled container hall beside a three-phase line
The containers arrived on a flatbed and the utility connection was still being made when they landed. That overlap is normal on rural sites, and it is the reason the electrical scope was separated from the cooling scope from the first drawing.
Two trades, two schedules, one pad
Why water
Out here the air is dry and the dust is fine. An air-cooled hall pulls that dust through the condensers all summer and pays for it in cleaning labour. A sealed water loop with a dry cooler at the end keeps the machine room closed and puts the heat rejection where a hose can reach it.
The trade is plumbing. A water-cooled container is a machine with two fluid circuits, not a box with fans, and the commissioning is a pressure test before it is a power-up.
Why the overlap
A rural service is its own project. The pole, the transformer and the metering are the utility’s schedule, not ours, and on this site that work was still running when the containers arrived.
Keeping the two scopes separate meant the containers could be set, levelled and pressure-tested while the line crew finished, and the electricians could terminate into a container that was already proven.
Three details that were decided on the pad

Slings stay on until the unit is on its plinth and the levels are read. On a gravel pad, a container that looks level is rarely level.

Terminations in a dedicated electrical compartment at the door end, not scattered along the wall. It is the difference between a two-hour job and a two-day job when something needs changing.

The cooler sits beside the container it serves, on its own plinth, with the pipe run short and visible. Long buried runs are where water-cooled sites go wrong.
From flatbed to first hash
What was actually on the pad
Configuration as delivered. Unit count, load and commercial terms are not disclosed.
Delivery week, in the order it happened





The products this specification maps to
Photographs are from the delivered project. The client is not named. Commercial values are withheld; the figures describe the configuration as shipped.