A battery that moves: storage on a skid, not on a foundation
Mobile boost charging and emergency supply do not allow for a poured foundation. This unit carries the battery racks, the PCS, the fire system and the monitoring in one container that can be lifted onto a truck and energised the same day.
Every fixed installation is a site; this one is a lift
Why it had to be mobile
Boost charging and emergency supply follow demand. A site that needs 500 kW this quarter may need it somewhere else next quarter, and a container on a skid can be moved; a battery hall cannot.
That changes the design brief. The unit has to survive the road, keep its cooling loop intact through transport, and be re-commissioned in hours rather than weeks.
What we integrated
Battery racks, PCS, distribution and environmental monitoring in one shell, with a compartment layout that separates the battery space from the electrical space so each can be worked on safely.
Liquid cooling with the pipework fixed for transport, aerosol fire suppression, industrial air conditioning and remote monitoring. Everything is tested as a whole unit in the factory, so the site work is a lift, a cable and a check.
What makes it movable without making it fragile

Two compartments with their own access, so the battery space stays sealed while the electrical side is serviced. Louvred doors give inspection without opening the unit.

Coolant pipework is bracketed for road transport and pressure-tested before dispatch. The cooling skid is part of the unit, not a site assembly.

PCS, metering and environmental monitoring sit in a walk-in control bay and report remotely, so a relocated unit comes back on line without re-baselining on site.
From factory to first kilowatt
What the unit actually delivers
Values describe the configuration as delivered. Ratings depend on the battery and PCS selected; commercial terms are not disclosed.
The unit, outside and in




The products this specification maps to
Published as an anonymised reference. The client is not named and the site location is given only to region level. Commercial values (contract sum, unit price) are withheld; the technical figures describe the configuration as delivered. Where a number has been rounded or scaled for confidentiality it is stated in the note above.
Send the load profile and where the unit has to move next.
We will come back with the compartment layout, the cooling calculation and the transport arrangement.