A mobile battery storage unit standing on site against a building elevation

Project case · Energy storage · Mobile BESS

A battery that moves: storage on a skid, not on a foundation

Mobile boost charging and emergency supply do not allow for a poured foundation. This unit carries the battery racks, the PCS, the fire system and the monitoring in one container that can be lifted onto a truck and energised the same day.

40 ftsingle container
Liquidcooled racks
Skidmounted, relocatable
One dayto energise on site
ClientEnergy service operator (confidential)
LocationMobile deployment, multiple sites
ScopeContainerised battery storage with PCS and monitoring
ContractDesign, integration, factory commissioning
UseBoost charging, peak shaving, emergency supply
01 / The brief

Every fixed installation is a site; this one is a lift

Why it had to be mobile

Boost charging and emergency supply follow demand. A site that needs 500 kW this quarter may need it somewhere else next quarter, and a container on a skid can be moved; a battery hall cannot.

That changes the design brief. The unit has to survive the road, keep its cooling loop intact through transport, and be re-commissioned in hours rather than weeks.

What we integrated

Battery racks, PCS, distribution and environmental monitoring in one shell, with a compartment layout that separates the battery space from the electrical space so each can be worked on safely.

Liquid cooling with the pipework fixed for transport, aerosol fire suppression, industrial air conditioning and remote monitoring. Everything is tested as a whole unit in the factory, so the site work is a lift, a cable and a check.

02 / What we delivered

What makes it movable without making it fragile

Battery and electrical, separated
01 / CompartmentsBattery and electrical, separated

Two compartments with their own access, so the battery space stays sealed while the electrical side is serviced. Louvred doors give inspection without opening the unit.

Liquid loop, transport-safe
02 / CoolingLiquid loop, transport-safe

Coolant pipework is bracketed for road transport and pressure-tested before dispatch. The cooling skid is part of the unit, not a site assembly.

Monitoring on the move
03 / ControlMonitoring on the move

PCS, metering and environmental monitoring sit in a walk-in control bay and report remotely, so a relocated unit comes back on line without re-baselining on site.

03 / Sequence

From factory to first kilowatt

Step 1SizingLoad profile, site supply and relocation plan agreed.
Step 2IntegrationRacks, PCS, cooling and fire system assembled in one shell.
Step 3Factory testCharge and discharge cycles run with the unit complete.
Step 4TransportUnit lifted onto a flatbed and moved to site on its skid base.
Step 5EnergiseCable connected, protection checked, unit back in service.
04 / By the numbers

What the unit actually delivers

40 ftfootprint, ISO handling
Liquidcooled battery racks
Sealedbattery compartment in transit
Remotemonitoring and metering

Values describe the configuration as delivered. Ratings depend on the battery and PCS selected; commercial terms are not disclosed.

05 / Site record

The unit, outside and in

The unit inside the assembly hall, racks and PCS already installed
The unit inside the assembly hall, racks and PCS already installed
Sister build: an enclosure on a cast plinth, ready to receive gear
Sister build: an enclosure on a cast plinth, ready to receive gear
Sealed access side, louvres closed for transport
Sealed access side, louvres closed for transport
Sister build: a sealed enclosure before the doors close
Sister build: a sealed enclosure before the doors close
Figures & disclosure

Published as an anonymised reference. The client is not named and the site location is given only to region level. Commercial values (contract sum, unit price) are withheld; the technical figures describe the configuration as delivered. Where a number has been rounded or scaled for confidentiality it is stated in the note above.

Send the load profile and where the unit has to move next.

We will come back with the compartment layout, the cooling calculation and the transport arrangement.

Talk to an engineer

Contact us

Committed to providing customers with high-quality and reliable container solutions.

ACTBOXES Whatsapp