Eight white 40 ft mining containers on a concrete pad in Georgia, USA

Project case · Mining containers · Georgia, USA

Eight 40 ft mining containers in Georgia, wired before the racks arrived

The pad was an old yard with a good service and a stand of pines behind it. The operator wanted the containers on the ground and the electrics finished before the first pallet of machines landed. That order of work is what the drawings were built around.

8containers
40 ftenclosure
2 rowseither side of the run
2025delivered
ClientMining operator (not named)
LocationGeorgia, United States
Scope8 × 40 ft air-cooled mining containers with PDU and suppression
ContractFabrication, ventilation, electrical fit-out, delivery, commissioning support
Site supply480 V three-phase, per-container metering
01 / The brief

A yard with power is worth more than a field with a view

What the site already had

The plot had been used for plant storage, so the concrete was down, the gate was wide enough for a low-loader and the utility had already been asked for a service. None of that is glamorous. All of it removes weeks.

The containers were set in two rows either side of a 6 m run, doors facing the run. That single decision fixes how everything else is installed: cable lengths, the walk between units, where a forklift can turn, and how far a technician has to carry a spare PSU in the rain.

What we had to get right

A 40 ft container full of ASICs is a heat problem with a steel skin. Each unit takes air in through louvres at one end and pushes it out at the other, so the rows cannot face each other. Get that wrong and the second row breathes the first row’s exhaust, which is how a hall ends up throttling in March.

Electrically the units are independent: each container has its own PDU with metering, its own main isolator and its own suppression bottle. One unit tripping should not take the row down, and the site electrician should be able to isolate a single box without walking back to the switchroom.

02 / What we delivered

Three things you only see once the boxes are on the ground

Louvres that do not face each other
01 / Air pathLouvres that do not face each other

Intake at one end, discharge at the other, rows staggered. The photograph was taken from the run between the rows, which is where the airflow argument is either won or lost.

Cables that can be traced
02 / CablingCables that can be traced

Power and network dressed above the rack tops and labelled per position. In a container this narrow the tray is the only place the cabling can live, and the labels are what turn a fault into a ten-minute job.

What is behind the liner
03 / EnvelopeWhat is behind the liner

Rock wool between the frame and the inner lining, photographed through an open panel. It is the part no client photographs on handover and the part that decides the condensing risk in a Georgia summer.

03 / Sequence

The order the work actually ran

Step 1Pad surveyLevels, service size, access for a low-loader and crane reach checked against the drawing.
Step 2Factory buildShells, insulation, louvres and door positions fixed on the jig; electricals fitted.
Step 3DeliveryUnits shipped complete, landed on the pad in row order rather than delivery order.
Step 4WiringEach unit terminated to its own isolator and metered; suppression and detection checked.
Step 5Rack-inRacks installed after the electrics were proven, so a fault is an electrical fault and not a rack fault.
04 / By the numbers

The numbers that decided the layout

8 × 40 ftcontainers on one pad
2 rowswith a 6 m working run between
1 PDUper container, individually metered
1 isolatorper container, at the door

Values describe the configuration as delivered. Rack count, hash rate and commercial terms are not disclosed.

05 / Site record

The yard, before and after the racks

The two rows seen from the access road. Eight units, all louvred the same way.
The two rows seen from the access road. Eight units, all louvred the same way.
Cable reels and a raised walkway between the rows during the wiring week
Cable reels and a raised walkway between the rows during the wiring week
The line running back towards the pines, units spaced for crane access
The line running back towards the pines, units spaced for crane access
Access door open on one unit, interior visible before rack-in
Access door open on one unit, interior visible before rack-in
Figures & disclosure

Photographs are from the delivered project. The client is not named. Commercial values are withheld; the figures describe the configuration as shipped.

Send the rack count, the service size and a photo of the pad.

We will come back with a container layout, the air path that goes with it and a wiring scope you can hand to a local electrician.

Talk to an engineer

Contact us