Ten suites, twenty keys, one month
A resort developer had planning consent for twenty keys and a season starting in five weeks. Ten expandable container suites went from order to first guest in thirty days.
The season was booked. The building was not started.
What the client was up against
Consent covered a low-rise accommodation block, and the tender came back at fourteen months. The operator had already taken bookings for the following season and had nowhere to put the guests.
A conventional block also fixed the room count for a decade. The developer wanted the option to add four suites in year two if the occupancy held, without a second construction phase and a second crane.
What we proposed
Ten expandable suites, each a complete unit: two rooms, living area, dining table, kitchenette and bathroom, with the walls folded in for shipping and opened on site in a day. Services run in a single wet core per suite, so the site work is a slab, a power drop, a water line and a drain.
Every suite is the same module, which is what makes a five-week programme possible: one design, one production run, one crew that does the same ten installations in the same order.
Three parts of the same product

Two rooms, living area, dining table, kitchenette, bathroom. Folded to a 40 ft footprint for shipping, opened and sealed within a day on site.

Steel frame with insulated sandwich panels, timber-look external skin, double-glazed openings. Rated for the coastal wind load and the humidity, not just the brochure.

Water, waste and power enter at one corner, so ten suites need ten connections rather than ten networks. Fit-out is factory-complete before the unit leaves.
Thirty days, and the first guest arrived on day thirty-one
What the developer got
Areas are gross external and rounded. The client, the site and the nightly rate are not disclosed. Schedule is as delivered.
Site record




The three products this project is built from
Published as an anonymised reference. The client is not named and the site location is given only to region level. Commercial values (contract sum, unit price) are withheld; the technical figures describe the configuration as delivered. Where a number has been rounded or scaled for confidentiality it is stated in the note above.