A grey equipment shell in a yard with a bank of louvres at one end and double doors beside them

Project case · Equipment enclosure · Shell in fabrication

An Open-Sided Shell, Photographed Before the Panels Went On

Frame, roof and floor, with the long side still open and a bank of louvres already in at one end. Not a finished box: the stage where you can still see how the load path runs.

Openside, panels to follow
1louvre bank, end wall
2door leaves beside it
0lining yet
ClientEquipment integrator (not named)
LocationChina, fabrication yard
ScopeGrey shell with an open long side, louvre bank and double door in the end wall, roof and floor in place, lining to follow
ContractShell fabrication, louvre bank, door set, coating
SiteFabrication yard, photographed mid-build
01 / The brief

The order of operations is the drawing

Structural work first, everything else after

Frames, posts, roof and floor go in while the side is still open, because that is the only moment when the inside of the shell is a workshop rather than a box. Welding, grinding and lifting all happen through the missing wall.

The louvre bank goes in early as well, since it is a structural frame of its own and it stiffens the end wall it sits in.

Then the panels, then the lining

Side panels close the shell; the lining goes in afterwards, because lining fitted before the last weld is lining that gets burnt. On a shell like this the sequence is visible in the photographs, which is why we keep them.

02 / What we delivered

Three stages in one photograph set

Open side, load path visible
01 / FrameOpen side, load path visible

Posts, top rail and floor rail with nothing between them. The opening is the access for the rest of the build.

Louvre bank and doors together
02 / End wallLouvre bank and doors together

Fixed louvres above and beside the door set, one frame, welded to the corner post. Air and access in the same end.

Nothing lined yet
03 / InteriorNothing lined yet

Bare frame and floor, ready for insulation and lining. Everything that will be hidden later is still on show.

03 / Sequence

How it goes together

Step 1FramePosts, rails and roof welded up with the long side open.
Step 2End wallLouvre bank and door frame fabricated and welded in as one unit.
Step 3Close upSide panels fitted, openings cut where services will land.
Step 4Insulate and lineInsulation and lining in, floor sealed, all after the last weld.
Step 5Coat and testPainted inside and out, water-tested, then lifted out.
04 / By the numbers

The shell, in four numbers

1louvre bank, end wall
2door leaves beside it
0panels on the long side yet
0lining yet

Taken from the build stage shown. Commercial values are not disclosed.

05 / Site record

Mid-build, in the yard

The open side, with the shop crane and gas bottles in the foreground
The open side, with the shop crane and gas bottles in the foreground
Inside: frame, floor and nothing else, before lining
Inside: frame, floor and nothing else, before lining
Louvre bank and door set in the end wall
Louvre bank and door set in the end wall
Figures & disclosure

Photographs are from the delivered project. The client is not named and the site is not disclosed. Commercial values are withheld; the figures describe the build as shipped.

Ask to see the build stage, not just the finished box.

A finished photograph tells you what the shell looks like. A photograph from mid-build tells you whether the frame behind it was built to carry anything.