A white 40 ft high cube container with two double doors set into the long side, on a concrete apron

Project case · Equipment enclosure · 40 ft high cube

A 40 ft High Cube With Two Double Doors on the Long Side

A standard 40 ft high cube shell, taken and cut twice on the long side. Two double doors, each in its own frame, finished flush in white. Photographed closed on the apron, before loading.

40 fthigh cube, 45G1
2double doors, long side
4leaves in total
0windows
ClientEquipment integrator (not named)
LocationChina, yard photographs
Scope40 ft high cube shell, two double door sets in the long side, frames welded and sealed, shell painted white inside and out
ContractShell supply, openings, door sets, sealing, coating
SiteConcrete apron; photographed the week it was finished
01 / The brief

Cutting a container is the easy part

Two openings, two frames, one shell

The corrugated long side is a shear panel: it carries the racking load of the box. Cut two holes in it and the load has to go somewhere, which is why each opening gets a welded frame tied back into the top rail, the floor rail and the nearest post.

The frame also gives the door something flat to seal against. Corrugation is not a sealing face, however much gasket you put on it.

Doors set flush, not proud

Both sets sit flush with the outside face. Nothing to catch on a strap, a sheet or a person walking past, and the box still stacks and still fits a trailer the way a container does.

Four leaves, container hardware throughout. The people opening these doors have opened container doors before, and they will not read a manual.

02 / What we delivered

Cut, framed, sealed

Two sets, four leaves
01 / DoorsTwo sets, four leaves

Each set is a pair of leaves with lock bars and a gasket round the perimeter. The pair is wide enough to take a pallet through, square, on a pallet truck.

The frame is the seal
02 / FrameThe frame is the seal

A flat steel frame welded round each opening and tied into the rails. The gasket compresses on steel, not on corrugation.

Still a container
03 / ShellStill a container

Corner castings, top rail and the 45G1 plate untouched. The box is still lifted by the castings, stacked by them and secured by them.

03 / Sequence

How it went together

Step 1Mark outDoor positions set from the equipment layout and the trailer deck height.
Step 2CutOpenings cut, edges dressed, frames fabricated to suit.
Step 3Weld and sealFrames welded to rails and posts, all seams sealed before paint.
Step 4HangDoor sets hung, gaskets fitted, lock bars adjusted.
Step 5Paint and testShell painted inside and out, then water-tested on the apron.
04 / By the numbers

The shell, in four numbers

40 fthigh cube, 45G1
2double door sets, long side
4leaves in total
0windows

Taken from the shell and the door schedule. Commercial values are not disclosed.

05 / Site record

On the apron

Oblique view: both sets closed, doors flush with the wall
Oblique view: both sets closed, doors flush with the wall
A door set closed in the long side, frame sealed and painted
A door set closed in the long side, frame sealed and painted
Top rail, corner casting and the 45G1 high cube plate
Top rail, corner casting and the 45G1 high cube plate
Figures & disclosure

Photographs are from the delivered project. The client is not named and the site is not disclosed. Commercial values are withheld; the figures describe the build as shipped.

Two doors or four, the frame is the same problem.

Send the footprint of what has to go through the side and the height of the trailer it will sit on, and we will place the openings before anything is cut.

Talk to an engineer