A 40 ft Shell That Is Half Louvre
Two bands of fixed louvre above a solid skirt, one double door mid-wall, the same treatment carried round the end. Inside, the louvres read as louvres: no ducting, no fan wall, no plant room bolted onto the side.
Ventilation sized as wall area, not as an add-on
The blades do the work a fan wall would
A container has roughly 120 square metres of envelope. In a shell like this one, the louvre bands give back a large part of it as free area, and free area is what the heat load is actually sized on.
So the decision is not “how many fans”, it is “how much of the wall can be opening”. Blades set at roughly 45 degrees, facing down and out, keep the rain out of the same opening the air comes through. Anything driven at the wall hits a blade, runs to its front edge and drops off; it cannot climb from one blade to the next.
The skirt stays solid
The lower 900 mm of the long side is plain sheet. That is where cable trays, earth bars, cable glands and the mounting feet of whatever is being installed will end up, and none of them can be fixed to a blade.
It also keeps the opening above the standing water line and above the height of the forklift tines that will inevitably be driven at this box.
Three things to look at

The same leaves you see from the yard, lined through to the inside face. Light comes in at the level you are working, and the inside of the wall stays a wall: nothing protrudes into the standing space.

Cut into the plain part of the wall, framed and welded to the corner post and the floor rail. Container-style lock bars, four hinges, a gasket right round. What goes in on a pallet comes through here.

Insulated lining in a light colour, joints on the ribs, floor sealed to the walls. A dark shell with a dark interior is a shell in which nobody can read a label.
How it went together
The shell, in four numbers
Measured from the shell. Commercial values are not disclosed.
In the yard, before the trailer



The products this build maps to
Photographs are from the delivered project. The client is not named and the site is not disclosed. Commercial values are withheld; the figures describe the build as shipped.
Send the equipment list before the drawing.
Heat load, the biggest item that has to pass through a door, and how the box gets off the truck decide more about a ventilated shell than any elevation will.