One unit to an island, one to a laterite road in West Africa, three plus one to a German yard. The containers were the same kind of job. Everything after they left the factory was not.
The factory is the easy part
What a single unit really costs
One container costs almost as much to build as ten. What it does not share is everything else: its own booking, its own export declaration, its own truck, its own unloading plan, and a full set of documents for a shipment that weighs twenty tonnes.
All three buyers asked the same question first: can we have just one, to see how it goes. The honest answer is yes, and the freight share per unit will be three to four times what it is in a batch. Better to say that on the quotation than at the port.
Three last miles
Mahé is a sea crossing and then a hill road. The unit travelled folded, wrapped and strapped, opened on site with the buyer’s own labour and a hired lift. Guinea is a laterite road from the port with no crane at the far end, so the dormitory box and the 20GP store were sized to what a lorry-mounted loader can set down. Germany was the easy one: hard road, standard flatbed, forklift on site.
None of that changes the container. It changes the packing spec, the lifting points, the sequence of the fit-out and what we put in the crate that travels with the unit.
What the destination changed

Shrink wrap over the folded unit, strapping at fixed intervals, corner protection under the straps. Salt air gets into anything that is not sealed before the ship loads it.

A dark shell in West Africa is a deliberate choice: less glare, less dust staining, and a roof that takes a water tank without a separate frame.

The German units were cut for full-height glazing. Every opening is a framed box welded into the shell, not a hole with a window dropped in.
One unit, five handovers
Three orders, measured the same way
Configuration as delivered. Freight rates and commercial values are not disclosed.
The three sites, as the buyer sent them



The products this specification maps to
Photographs are from the delivered project. The client is not named. Commercial values are withheld; the figures describe the configuration as shipped.
Tell us the port, the road and what you have at the other end.
A crane, a forklift, a lorry loader or twelve men and a ramp: that answer decides the packing, the lifting points and how much of the unit we finish in the factory.