A hydrogen refuelling station equipment cabin seen from the access side

Project case · Hydrogen equipment · Refuelling station

The equipment room of a hydrogen station, delivered as one unit

A refuelling station needs its compression, storage and control gear in a classified space next to the dispensers. Building that room on a forecourt is slow, so it arrives as a cabin.

One cabincompression, storage, control
Reliefsized to the volume
DetectionH2 at the high points
Forecourtwork reduced to connections
ClientHydrogen station developer (confidential)
LocationChina
ScopeExplosion-protected equipment cabin for a refuelling station
ContractDesign, fabrication, integration, factory test, delivery
StandardRelief panels, H2 detection, forced ventilation, Ex electricals, fire linkage
01 / The brief

A forecourt is the worst place to build a room

What the station could not afford

A hydrogen forecourt is a live retail site with a small footprint and a safety case attached to every square metre. Building an equipment room there means scaffolding, hot work, and a construction programme running next to dispensers that the operator wants open.

The room also has to satisfy a specific set of rules: pressure relief in a safe direction, continuous ventilation, gas detection that trips the supply, and electrical equipment rated for the zone. Those are easier to guarantee in a factory than on a forecourt.

What we delivered

A cabin containing the compression package, the control panels and the valve gear, with relief panels sized to the volume, hydrogen detection at the high points, forced ventilation interlocked with the detection loop and Ex-rated electricals throughout.

It arrives with the equipment installed and the interlocks proven. On site the work is a lift onto the plinth, a process connection to the dispenser line and a power connection, followed by the authority inspection.

02 / What we delivered

Three interfaces that have to be right on day one

Discharge where nobody stands
01 / ReliefDischarge where nobody stands

Relief panels positioned against the walkway and the dispenser approach, sized to the enclosure volume rather than to the door area.

Swept whether or not it is occupied
02 / VentilationSwept whether or not it is occupied

Forced ventilation running continuously, interlocked with detection, so a leak is diluted and alarmed rather than accumulated.

Piped, tested, then connected
03 / ProcessPiped, tested, then connected

Valve gear and process pipework installed and pressure-tested in the factory. Site work is one connection to the dispenser line.

03 / Sequence

From station layout to inspection

Step 1LayoutCabin position, dispenser route and exclusion zones fixed on the site plan.
Step 2BuildShell, relief panels and penetrations fabricated to the zone drawing.
Step 3IntegrateCompression package, valve gear, detection and ventilation installed.
Step 4TestPressure test, interlock test and function test recorded.
Step 5CommissionCabin set on the plinth, process and power connected, inspected.
04 / By the numbers

What the station receives

One cabincompression, control and valve gear
Reliefsized to the enclosure volume
Continuousforced ventilation, interlocked
Ex-ratedelectricals for the classified zone

Values describe the configuration as delivered. Station throughput and commercial terms are not disclosed.

05 / Site record

The cabin and its service side

A hydrogen equipment cabin with its relief panels on the access face
A hydrogen equipment cabin with its relief panels on the access face
Sister build: a skid-mounted package with access platform
Sister build: a skid-mounted package with access platform
Sealed walk-in enclosure with the access door closed
Sealed walk-in enclosure with the access door closed
Sister build: a prefabricated enclosure on a concrete plinth
Sister build: a prefabricated enclosure on a concrete plinth
Figures & disclosure

Published as an anonymised reference. The client is not named and the site location is given only to region level. Commercial values (contract sum, unit price) are withheld; the technical figures describe the configuration as delivered. Where a number has been rounded or scaled for confidentiality it is stated in the note above.

Send the station layout and the process schedule.

Tell us the equipment, the zone classification and the inspection authority. We will come back with the cabin arrangement and the interlock schedule.

Talk to an engineer

Contact us