Blue 40 ft container office units with glazed openings on a yard in Germany

Project case · Single-unit export · Indian Ocean, West Africa, Europe

Three single-container deliveries: Seychelles, Guinea and Germany

One unit to an island, one to a laterite road in West Africa, three plus one to a German yard. The containers were the same kind of job. Everything after they left the factory was not.

3destinations
1 unittwo of the three orders
2sites with no crane
3climates
ClientThree separate buyers (not named)
LocationMahé (Seychelles), Guinea, Germany
Scope1 × 40 ft expandable; 1 × 40HQ dormitory + 20GP store; 3 + 1 container offices
ContractFabrication, packing, freight booking, site handover support
ConstraintNo crane on site at two of the three destinations
01 / The brief

The factory is the easy part

What a single unit really costs

One container costs almost as much to build as ten. What it does not share is everything else: its own booking, its own export declaration, its own truck, its own unloading plan, and a full set of documents for a shipment that weighs twenty tonnes.

All three buyers asked the same question first: can we have just one, to see how it goes. The honest answer is yes, and the freight share per unit will be three to four times what it is in a batch. Better to say that on the quotation than at the port.

Three last miles

Mahé is a sea crossing and then a hill road. The unit travelled folded, wrapped and strapped, opened on site with the buyer’s own labour and a hired lift. Guinea is a laterite road from the port with no crane at the far end, so the dormitory box and the 20GP store were sized to what a lorry-mounted loader can set down. Germany was the easy one: hard road, standard flatbed, forklift on site.

None of that changes the container. It changes the packing spec, the lifting points, the sequence of the fit-out and what we put in the crate that travels with the unit.

02 / What we delivered

What the destination changed

Wrapped for a crossing, not a road
01 / PackingWrapped for a crossing, not a road

Shrink wrap over the folded unit, strapping at fixed intervals, corner protection under the straps. Salt air gets into anything that is not sealed before the ship loads it.

Black shell, water on the roof
02 / ClimateBlack shell, water on the roof

A dark shell in West Africa is a deliberate choice: less glare, less dust staining, and a roof that takes a water tank without a separate frame.

Glass needs a frame behind it
03 / OpeningsGlass needs a frame behind it

The German units were cut for full-height glazing. Every opening is a framed box welded into the shell, not a hole with a window dropped in.

03 / Sequence

One unit, five handovers

Step 1Specify for the siteClimate, access, lifting equipment and labour decided before the drawing is released.
Step 2Build and packUnit completed, tested, then wrapped and strapped for the mode of transport.
Step 3Book and declareFreight, export documents and destination clearance handled as one file.
Step 4Land and movePort handling, onward truck and unloading method agreed in advance with the buyer.
Step 5Open and hand overUnit opened, sealed and connected; handover notes left with photographs.
04 / By the numbers

Three orders, measured the same way

3destinations, one supplier
1unit on two of the orders
2sites with no crane
1 specfor wrapping and lifting

Configuration as delivered. Freight rates and commercial values are not disclosed.

05 / Site record

The three sites, as the buyer sent them

Mahé: the unit opened on site, door swung and crates outside
Mahé: the unit opened on site, door swung and crates outside
Guinea: the dormitory box on a trailer, laterite road behind
Guinea: the dormitory box on a trailer, laterite road behind
Wrapped and strapped on the slope, waiting for the lift
Wrapped and strapped on the slope, waiting for the lift
Figures & disclosure

Photographs are from the delivered project. The client is not named. Commercial values are withheld; the figures describe the configuration as shipped.

Tell us the port, the road and what you have at the other end.

A crane, a forklift, a lorry loader or twelve men and a ramp: that answer decides the packing, the lifting points and how much of the unit we finish in the factory.

Talk to an engineer

Contact us

Committed to providing customers with high-quality and reliable container solutions.

ACTBOXES Whatsapp