Twenty-eight keys, thirty-three modules, shipped as a hotel
A hotel developer in the Philippines needed rooms finished to a hospitality standard before the building existed. Three storeys of modules left the factory complete, with bathrooms and services installed.
A hotel room is the hardest thing to finish on site
Why the rooms came from a factory
A guest room is a bathroom, a bed wall, a wardrobe, a services riser and a fire strategy in about twenty square metres. Every trade in the building has work in that space, and they all want it at once.
On an island site with a short weather window and a labour market that is already busy, that sequence is where hotel programmes fail. The developer moved the sequence indoors.
What we delivered
Modules finished as guest rooms: en-suite pod, joinery, headboard wall, lighting, air conditioning and the electrical installation, all complete and tested at the factory, then shipped with the interior protected for the sea passage.
On site the modules are stacked three high, braced, and the walkway, stairs and roof are added. The building services connect at defined points per module, which is what keeps the site programme short.
Three details that make a stacked hotel work

Corner castings and a bracing layout designed for the stack, not for a single unit. Stacked modules transfer load through the corners, not through the walls.

The en-suite is assembled and tested as a unit before it goes into the module. Water testing a hundred bathrooms on site is a programme risk, not a quality measure.

Interior protection, sealed openings and lifting points marked for the receiving port. The crossing is part of the specification.
From room layout to first guest
What the building is made of
Values describe the configuration as delivered. Commercial terms are not disclosed.
The hotel, and the modules behind it




The products this specification maps to
Site, scale and dates are as published for this project. Commercial values are withheld. Technical figures describe the configuration as delivered; the note above states which values are rounded.