A two-storey container fire station with red apparatus bay doors

Project case · Modular buildings · Emergency services

A fire station with apparatus bays, built while the site was still being levelled

A fire station is judged on the day it can turn out, not on the day it is finished. This one was built as modules in a factory, including the apparatus bays, and assembled on site in days.

2 storeysapparatus and crew
Dayson site to weather-tight
Baysdrive-through apparatus
Relocatablemodule by module
ClientEmergency services operator (confidential)
LocationUrban site, China
ScopeTwo-storey modular fire station
ContractDesign, factory fit-out, delivery and assembly
UseApparatus bays, crew accommodation, watch office
01 / The brief

The bay door is the whole problem

What makes a fire station different

An apparatus bay is a very large opening in a very stiff structure. The building has to take the load of a fire appliance, the door has to open in seconds, and the floor has to drain and stay flat under a moving vehicle.

A station also has to be occupied from the first day. Crew rooms, watch office, decontamination and drying need to be finished, not shelled, when the appliance arrives.

What we proposed

A module set rather than a building: apparatus bay modules engineered around the door opening, crew and office modules fitted out in the factory, and a stair and circulation module that ties the two floors together.

Everything left the factory finished, including the wet areas and the electrical installation. On site the work was foundations, a crane and connections, which is why the station could be occupied in the same season it was ordered.

02 / What we delivered

Three decisions that made the schedule work

Structure around the opening
01 / BaysStructure around the opening

Bay modules are framed for the clear span of the door and the point load of an appliance, with the door track built into the module rather than added on site.

Finished before it ships
02 / Fit-outFinished before it ships

Crew rooms, watch office and welfare areas are panelled, wired and plumbed in the factory, so occupation does not wait on a second trade.

Two floors, one stair module
03 / StackTwo floors, one stair module

The upper floor lands on the bay modules through a braced stair core, which keeps the circulation inside the building instead of in an external tower.

03 / Sequence

How a station gets built in a season

Step 1DesignAppliance dimensions, turnout route and bay clear span fixed first.
Step 2FactoryBay, crew and stair modules built and fitted out in parallel.
Step 3FoundationsPads and service connections prepared while modules are in build.
Step 4AssemblyModules lifted and stacked, joints sealed, doors and stairs connected.
Step 5TurnoutAppliances moved in and the station goes live.
04 / By the numbers

What the station actually provides

2 storeysbays below, crew above
Drive-throughapparatus bays
Fittedwet areas and electrics from factory
Relocatablemodules can be lifted out and reused

Values describe the configuration as delivered. Commercial terms are not disclosed.

05 / Site record

The station and the module system behind it

Sister project: a modular block forming a street edge
Sister project: a modular block forming a street edge
Sister project: a two-storey module block on a city street
Sister project: a two-storey module block on a city street
Sister project: a module street handed over complete
Sister project: a module street handed over complete
Sister project: a container suite handed over finished
Sister project: a container suite handed over finished
Figures & disclosure

Published as an anonymised reference. The client is not named and the site location is given only to region level. Commercial values (contract sum, unit price) are withheld; the technical figures describe the configuration as delivered. Where a number has been rounded or scaled for confidentiality it is stated in the note above.

Send the appliance dimensions and the turnout route.

We will come back with the bay module layout, the door specification and an assembly sequence for the site.

Talk to an engineer

Contact us

Committed to providing customers with high-quality and reliable container solutions.

ACTBOXES Whatsapp