A white clean-room winch cabin built for the Chinese polar research programme

Project case · Special custom · Polar research

A clean room that sails south and stays clean at −40 °C

The Chinese polar research programme needed a winch cabin that could be certified on land, sealed on deck and operated as a clean space at the bottom of the world. It was built as one unit and shipped whole.

1 unitbuilt and shipped whole
Clean finishpanelled interior
−40 °Cdesign ambient
Sealeddoors and penetrations
ClientChinese Polar Research (CHINARE)
LocationSupplied for vessel deployment, polar waters
ScopeOne clean winch cabin, fitted and factory-tested
ContractDesign, build, factory test, deliver to ship
FinishClean-panel interior, sealed doors, positive-pressure ventilation
01 / The brief

Before it is a cabin, it has to be a clean room

What the programme was up against

A winch cabin on a research vessel is not a store. The equipment inside has to be worked on in a controlled space, which means sealed joints, washable surfaces, filtered ventilation and no place for ice to sit and expand.

It also has to survive the journey: lifted as a single unit onto a deck that moves, in air that drops below −40 °C, with the whole cabin inspected and signed off before the vessel sails. Anything assembled on the quay is a risk the programme did not want.

What we built

One cabin, framed and clad as a single structure. Interior in clean panel with coved joints, sealed doors and a positive-pressure ventilation set, so the space holds its clean state rather than depending on how carefully the door is closed.

Structure was checked against deck load and wind load rather than ground bearing, and the lifting points were set for a four-leg lift with the equipment already installed. The whole unit was pre-assembled, sealed and pressure-tested in the factory before it left.

02 / What we delivered

Three things that had to be right before it sailed

Clean finish, panelled inside
01 / EnvelopeClean finish, panelled inside

Panelled walls and ceiling with coved joints, sealed light fittings and a wipe-down finish. No exposed framing and no ledge for ice to collect on.

Doors and penetrations
02 / SealingDoors and penetrations

Insulated sealed doors, gasketed cable and pipe penetrations, and a ventilation set that holds positive pressure so the clean state survives the crossing.

Frame checked for deck load
03 / StructureFrame checked for deck load

The frame is braced for transport and for a moving deck, not for a concrete slab. Lifting points sit on the main frame and take the unit with the winch installed.

03 / Sequence

On land, one unit at a time

Step 1Design freezeDeck envelope, lifting points and clean-room finish agreed before cutting steel.
Step 2BuildFrame, cladding, interior panels and services assembled in one bay.
Step 3Factory testSealing, pressure and finish checked with the equipment installed.
Step 4DeliveryUnit lifted whole onto the vessel, fixed at the prepared deck points.
Step 5HandoverDocumentation and inspection closed before the vessel sails.
04 / By the numbers

What the specification actually promises

Sealeddoors, penetrations and cable entries
Positivepressure held in the clean space
−40 °Cdesign ambient for structure and seals
One liftthe unit ships complete, not in parts

Values describe the configuration as delivered. Commercial terms are not disclosed.

05 / Site record

The cabin, inside and out

Enclosures of this build system lined up for dispatch
Enclosures of this build system lined up for dispatch
Interior during build: services roughed in before the clean panels close
Interior during build: services roughed in before the clean panels close
The whole unit is lifted, never assembled on the quay
The whole unit is lifted, never assembled on the quay
Sister build: a sealed equipment enclosure delivered to a live site
Sister build: a sealed equipment enclosure delivered to a live site
Figures & disclosure

Site, scale and dates are as published for this project. Commercial values are withheld. Technical figures describe the configuration as delivered; the note above states which values are rounded.

Send the deck drawing and the clean-room class. We will send the build-up.

Tell us the ambient, the lifting arrangement and the inspection regime. We will come back with the envelope specification and a factory test plan.

Talk to an engineer

Contact us