Forty hydrogen cabins, one livery, one inspection standard

A hydrogen equipment maker needed its skid-mounted plant housed in cabins that all looked and performed the same, batch after batch, with the gas and electrical systems joined up before the units left the factory.

Batch buildone standard, repeated
Ex-proofrelief panels and detection
Forcedventilation interlocked
Factorygas and electrical tested
ClientHydrogen equipment manufacturer (confidential)
LocationMultiple project sites, China
ScopeExplosion-protected equipment cabins, batch production
ContractDesign, fabrication, systems integration, factory test, delivery
StandardExplosion relief, H2 detection, forced ventilation, Ex-rated electricals
01 / The brief

When the cabin is part of the safety case

What a hydrogen cabin has to do

Hydrogen does not wait for a leak to become a problem. A cabin housing a reformer, a compressor or a control skid is a classified space: the walls have to relieve an internal overpressure in a controlled direction, the air has to be swept whether or not anyone is working inside, and every switch, lamp and junction box has to be rated for the zone it sits in.

The maker was also building the same plant repeatedly for different sites. What it needed was not a bespoke cabin each time, but a repeatable one: same envelope, same penetrations, same test record, so the hundredth unit is the same as the first.

What we built

A cabin family with relief panels sized to the enclosure volume, hydrogen detection at the high points, forced ventilation interlocked with the detection loop, and Ex-rated electricals throughout. Gas trains and control panels are installed at the factory, then the whole assembly is leak-tested and function-tested before dispatch.

Because the design is fixed, the batch runs on one jig and one inspection sheet. Livery, signage and door furniture are applied to a single drawing, which is why the row of units on a site looks like a row rather than a collection.

02 / What we delivered

Three things that decide whether the cabin passes inspection

Relief area, not a weak panel
01 / ReliefRelief area, not a weak panel

Relief panels sized against the enclosure volume and positioned so the discharge goes where people are not. A generic louvre does not satisfy this.

Piped and tested in the factory
02 / Gas trainPiped and tested in the factory

Valve train, regulators and instrument connections assembled and pressure-tested before dispatch, so site work is a connection rather than a build.

One drawing across the batch
03 / ConsistencyOne drawing across the batch

Identical envelope, identical penetrations, identical inspection sheet. Batch consistency is a documentation problem before it is a manufacturing one.

03 / Sequence

From drawing release to the site boundary

Step 1Envelope releaseZone classification and equipment schedule fixed on one drawing.
Step 2FabricationShells built on a common jig, relief and penetration positions fixed.
Step 3IntegrationGas train, detection, ventilation and Ex electricals installed.
Step 4Factory testLeak test, function test and interlock verification recorded per unit.
Step 5DispatchUnits shipped complete, with the test record travelling with the cabin.
04 / By the numbers

What the batch actually repeats

Batchone envelope, one livery, one test sheet
Ex-ratedelectricals matched to the zone
Interlockeddetection to ventilation and alarm
Per unittest record issued before dispatch

Values describe the configuration as delivered. Batch size and commercial terms are not disclosed.

05 / Site record

The batch, and the equipment inside it

Sister build: a skid-mounted package with its access platform and handrail
Sister build: a skid-mounted package with its access platform and handrail
A shell of the same family in the paint shop
A shell of the same family in the paint shop
Louvred access face, sealed against weather and washdown
Louvred access face, sealed against weather and washdown
Sister build: a sealed walk-in cabin with the access door closed
Sister build: a sealed walk-in cabin with the access door closed
Figures & disclosure

Published as an anonymised reference. The client is not named and the site location is given only to region level. Commercial values (contract sum, unit price) are withheld; the technical figures describe the configuration as delivered. Where a number has been rounded or scaled for confidentiality it is stated in the note above.

Send the zone drawing and the equipment schedule. We will send the envelope and the test plan.

Tell us the gas, the volume and the inspection authority. We will come back with the relief area, the ventilation rate and a per-unit test record you can hand over.

Talk to an engineer

Contact us

Committed to providing customers with high-quality and reliable container solutions.

ACTBOXES Whatsapp