A 20 ft container cabin with dark steel shell and timber slat cladding, standing on timber bearers

Project case · 20 ft container house · CH701

Twenty feet, fifty metres a second, and a class A envelope

A coastal operator needed guest cabins that could be lifted onto prepared plots, certified before they landed, and left out in the weather all year. The CH701 is the unit that went onto every plot.

20 ftfootprint
50 m/sdesign wind
Class Afire rating
8.5seismic level
ClientCoastal hospitality operator (confidential)
LocationCoastal site, warm-humid climate
ScopeCH701 20 ft cabins, delivered fitted
ContractSupply, delivered and set on prepared pads
CertificationCSA structural, Class A fire
01 / The brief

A cabin that has to be certified before anyone sees the site

What the client was up against

The plots were ready before the buildings were. Each one was a levelled pad with a power drop, and nothing else — no road for a crane, no site accommodation, no tolerance for a construction crew living on site for a month.

Coastal approvals also asked for numbers, not adjectives: a structural certification, a fire class, a wind speed the envelope could take, and a noise figure for the rooms. A drawing set that arrives after the units land is too late.

What we proposed

One 20 ft unit, built to a fixed specification and certified as a unit rather than as a building: CSA structural certification, Class A fire performance, 22–122 °F insulation range, seismic level 8.5, sound reduction of 40 dB or better, and a design wind of 50 m/s.

Everything ships inside the shell — bathroom pod, kitchenette, wiring, finishes. On site it is a lift, a connection and a seal, which is what makes twenty plots deliverable in one programme instead of twenty small building projects.

02 / What we delivered

The envelope is the product

Insulated panel envelope
01 / ShellInsulated panel envelope

Steel frame, insulated sandwich panels, timber-look external skin. Rated 22–122 °F, Class A fire performance, sound reduction 40 dB or better.

Bathroom and kitchenette pod
02 / Wet coreBathroom and kitchenette pod

Pod built and tested in the factory, dropped into the shell before the panels close. One water in, one waste out, one isolator.

Anchors sized to 50 m/s
03 / Tie-downAnchors sized to 50 m/s

Corner castings welded to cast-in plates rather than relying on self-weight. Design wind 50 m/s, seismic level 8.5.

03 / Sequence

From pad to keys, one unit at a time

Step 1PadsLevel pad, power drop and drain per plot; crane access from the road.
Step 2FactoryShell, pod and finishes assembled and pressure-tested indoors.
Step 3CertificationStructural, fire and acoustic documentation issued before shipping.
Step 4LandingUnit lifted onto the pad, tied down, services connected and sealed.
Step 5HandoverSnag list closed the same week; keys issued per plot.
04 / By the numbers

What the specification actually promises

50 m/sdesign wind, tied to the pad
Class Afire performance on the envelope
40 dBminimum sound reduction through the wall build-up
8.5seismic level, CSA certified structure

Values are the published specification of the CH701 build, not site measurements. No commercial terms are disclosed.

05 / Site record

The unit, inside and out

A row of units on prepared pads, waiting on service connections
A row of units on prepared pads, waiting on service connections
Bedroom end: joinery and glazing fitted in the factory
Bedroom end: joinery and glazing fitted in the factory
Wet core pod, complete before the panels close
Wet core pod, complete before the panels close
Glazed end wall, factory-fitted to take the sea view
Glazed end wall, factory-fitted to take the sea view
Figures & disclosure

Published as an anonymised reference. The client is not named and the site location is given only to region level. Commercial values (contract sum, unit price) are withheld; the technical figures describe the configuration as delivered. Where a number has been rounded or scaled for confidentiality it is stated in the note above.

Tell us the wind speed and the certification body. We will send the build-up.

Send the site plan and the approval conditions. We will come back with the envelope specification, the certification route and a delivery sequence for the plots.

Talk to an engineer

Contact us

Committed to providing customers with high-quality and reliable container solutions.

ACTBOXES Whatsapp